6/Service
6-17 6-17
13. Turn off the humidifier.
14. Perform the Electrical Safety Check and checkout procedure (section 3).
Note: The salt in the calibration bottle may only be used for a period of one year
after it's initial mix with water.
Valve Checkout
1. Pull out fill tray and verify that the valve is closed.
2. Turn on the humidifier with no water in the tray and set for 85% RH.
3. In approximately 10 minutes (no more than 20 minutes) the add water prompt
should come on.
4. After five minutes, pull out the fill tray and verify that the valve is open. Allow the
heater to cool before putting the humidifier back into service.
Note: The Add Water prompt may come on.
Electrical Safety Check
Leakage current
Use approved equipment and techniques to test the unit’s leakage current and ground
continuity. Follow the directions supplied by the test equipment manufacturer to verify
the following:
1. Less than 300 microamperes measured at any exposed metal surface for
equipment rated at 120 Vac, 50/60 Hz.
2. Less than 500 microamperes measured at any exposed metal surface for
equipment rated at 220/230/240 Vac, 50/60 Hz.
Summary of Contents for Ohio Care Plus
Page 20: ...2 General Information 2 4 2 4 Notes...
Page 24: ...4 Using the Servo controlled Humidifier 4 2 4 1 Notes...
Page 46: ...6 Service 6 18 6 18...
Page 53: ...8 Schematics 8 1 Figure 8 1 Wiring Diagram Servo controlled Humidifier 8 Schematics CI 18 059...
Page 55: ...8 Schematics 8 3 Figure 8 3 Digital section of the Control Display Board Assembly CI 18 061...
Page 56: ...8 Schematics 8 4 Figure 8 4 Analog section of the Control Display Board Assembly CI 18 062...
Page 58: ...8 Schematics 8 6 Figure 8 6 Display section of the Control Display Board Assembly CI 18 064...
Page 67: ......