Installation
3-7
Part 1126187_05
E
2021
Nordson Corporation
S
In some more demanding applications, use the heat exchanger
already installed in your applicator.
S
Supply clean air at a pressure less than 30psi (2bar) via 4mm
high flex tubing.
S
To make the heat exchanger operate, use 1126121 KIT, AIR
FLUSH, HEAT XCH, VULCANJET, found on page 9-10.
Step 3: Connecting the Controller and Air Cables
1. Refer to figure 3-3. Use the part numbers as a reference when
connecting the seven cables.
S
Make sure the main power supply is NOT energized or plugged in.
2. When done, proceed to
Step 4, Commissioning the Controller
.
1
3
4
5
CONTROLLER BACK
APPLICATOR RIGHT
ROBOT BACK
PNEUMATIC KIT FRONT
2
6
7
1125179
1125180
1125184
1125181
1125182
DB-25, Straight-pin, Male-to-Male I/O Cable
(Customer supplied)
Power
Cable
(Customer supplied)
Figure 3‐3 Cable connections
Summary of Contents for Vulcan Jet
Page 26: ...Description 2 8 Part 1126187_05 E 2021 Nordson Corporation This page intentionally left blank...
Page 162: ...Parts 9 4 Part 1126187_05 E 2021 Nordson Corporation Figure 9 2 Vulcan Jet applicator parts...
Page 163: ...Parts 9 5 Part 1126187_05 E 2021 Nordson Corporation Figure 9 3 Vulcan Jet applicator parts...
Page 171: ......
Page 172: ......