Repair
7-2
E
1997 Nordson Corporation
All rights reserved
107 070C
Issued 9/97
Manual 21-36
5. See Figure 7-2. Remove the non-conductive screws (2) holding the
rear shroud (1) to the valve plate (6). Remove the rear shroud.
6. Remove the non-conductive screws (2) holding the front shroud (4) to
the turbine (5).
7. Push on the nose of the turbine (5) and gently slide the front
shroud (4) and the charge ring assembly (3) off.
2136016A
1
3
2
Cup removal
1. Turbine shaft
2. Charge ring
3. Cup
2. Disassembling the RA-16
Rotary Atomizer
(contd.)
Summary of Contents for RA-16
Page 7: ...E 1995 Nordson Corporation All rights reserved Issued 11 95 A1EN 03 SF LIQD 3 Section 1 Safety...
Page 8: ...Safety 1 0 E 1995 Nordson Corporation All rights reserved Issued 11 95 A1EN 03 SF LIQD 3...
Page 22: ...Safety 1 14 E 1995 Nordson Corporation All rights reserved Issued 11 95 A1EN 03 SF LIQD 3...
Page 44: ...Operation 4 0 E 1997 Nordson Corporation All rights reserved 107 070C Issued 9 97 Manual 21 36...
Page 50: ...Operation 4 6 E 1997 Nordson Corporation All rights reserved 107 070C Issued 9 97 Manual 21 36...
Page 64: ...Repair 7 0 E 1997 Nordson Corporation All rights reserved 107 070C Issued 9 97 Manual 21 36...
Page 76: ...Repair 7 12 E 1997 Nordson Corporation All rights reserved 107 070C Issued 9 97 Manual 21 36...
Page 78: ...Parts 8 0 E 1997 Nordson Corporation All rights reserved 107 070C Issued 9 97 Manual 21 36...
Page 88: ...Parts 8 10 E 1997 Nordson Corporation All rights reserved 107 070C Issued 9 97 Manual 21 36...