![NorAM 65E Turbo Operator'S Manual Download Page 71](http://html1.mh-extra.com/html/noram/65e-turbo/65e-turbo_operators-manual_1700493071.webp)
NORAM 65ET GRADER
3-9
Lubrication and Maintenacne
3
EVERY 50 HOURS OR WEEKLY
Operation 7 - Check Wheel Lug Nuts
Check to ensure wheel lug nuts, 1, are installed and tight on all
wheels. Use a torque wrench to verify the front and rear wheel lug
nuts are torqued to 440-475 N×m (325-350 lb-ft.).
NOTE:
Operations 8 through 21 refer to lubrication points.
References made to number of shots assumes the use of a standard
grease gun. Each shot or pump is the equivalent of 1.5 grams (0.05
oz).
Operation 8 - Lubricate Moldboard Lift Cylinder Balls
One fitting, 1, on lower end of each lift cylinder. Lubricate with 2-
4 shots each.
Operation 9 - Lubricate Circle Shift Cylinder Balls
One fitting, 2, on each end of circle shift cylinder. Lubricate with
2-4 shots each.
Operation 10 - Lubricate Draw Bar Pivot Pins
One fitting, 1, on each side of the horizontal pin. One fitting, 2, is
located on top of the twist pin. Lubricate with 2-4 shots each.
Summary of Contents for 65E Turbo
Page 2: ...This page intentionally left blank ...
Page 4: ...NORAM 65ET GRADER 0 2 ...
Page 12: ...1 NORAM 65ET GRADER 0 8 Safety 0 ...
Page 34: ...1 NORAM 65ET GRADER 1 22 General Information 1 ...
Page 100: ...1 NORAM 65ET GRADER 3 38 Lubrication and Maintenance 3 ...
Page 101: ...NORAM 65ET GRADER 3 39 Lubrication and Maintenacne 3 ...
Page 102: ...1 NORAM 65ET GRADER 3 40 Lubrication and Maintenance 3 ...
Page 114: ...1 NORAM 65E GRADER 4 12 Specifications 4 ...
Page 116: ...1 NORAM 65E GRADER 5 2 Troubleshooting 5 Hydraulics and Implements ...
Page 117: ......
Page 118: ......