Align the holes on the Tool Kit Holder with the T-Nuts previously installed in STEP 31a. Bolt through and secure
with M8 Bolts and Nylon Washers.
A) Loosen the Bolts securing the Shifter Arm Brackets to the Vertical Posts. Adjust to your desired
height and distance.
B) Loosen the Bolts securing the Shifter Plate and adjust the assembly to your desired angle. Tighten the Bolts to
lock the Shifter Assembly in position.
26
26
PARTS:
• • 1 x Shifter Plate
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
34a
Align the curved slots on the Shifter Plate with T-Nuts previously installed in STEP 31a & STEP 31c. Bolt
through and secure with M8 Bolts and Washers.
PARTS:
• • 2 x M8 16mm Bolts
• • 2 x M8 Washers
33
Align the T-Nuts previously installed into the Shifter Arm in STEP 31b with the holes on the bottom Shifter Arm
Bracket previously installed in STEP 29. Bolt through and secure using M8 Bolts and Washers.
PARTS:
• • NIL
34b
A
)
B
)
27
27
PARTS:
• • 2 x M8 16mm Bolts
• • 2 x Nylon Washers
35
36
Your Setup is complete.
A:
Align end-cap to
corner of extrusion.
B:
Depress the centre
of the end-cap and align
the tab to the first hole.
Then align second tab
with the second hole.
C:
Finished End Cap.
YOUR COCKPIT IS COMPLETE
It’s time to install your electronics. If you have any questions about your setup you
can contact us directly at:
or you can join the
community on Discord or Facebook
bit.ly/nlr-discord
bit.ly/NLRowner
Video Instruction: bit.ly/nlrbuild
34a