
IMPORTANT
Do not extend the room until the room has been serviced. Any solenoid valves left open should be closed.
The threaded rods should be completely removed before room is fully extended. If there is not enough room
to remove both threaded rods completely, alternate backing the threaded rods out and slightly extending the
room. Be careful to not extend the room so far that the threaded rods impact the coach wall or the
mechanism.
2. Push the room switch to "extend" until the room is within one inch of being fully extended. Threaded rods
should be completely removed at this time. Do not allow room to bind.
3. Retract all lift bolts completely. If room starts to drop, alternate between lift bolts evenly while turning lift bolts.
4. After lift bolts are retracted, push room switch to "extend" until room is fully extended and down. If room
dropped while retracting lift bolts, push room switch to "extend" for five to ten seconds.
5. Retract room with room switch.
IMPORTANT
If at any stage something is not understood, or if the room begins to bind, do not force the room. Contact
Newmar Customer Support for assistance.
FOR MORE INFORMATION
Refer to the Universal Platform Level-Out Room Extension Mechanism Manual Room Lift Procedures.pdf in Newgle.
1
Material sourced from http://www.hwh.com/ml55155.pdf as adapted for Newmar Corporation v.09NOV15
© 2018 Copyright Newmar Corporation. All rights reserved. For the most up-to-date version of this content, and for more product-specific information, please refer to Newgle.
141