
NOTICE
There may be more than one platform lift cylinder
assembly. There is a manual lift bolt for each
assembly. All lift bolts must be used to lift the room.
2. Locate
the lift
cylinder
covers, like
the
examples
shown.
3. Do not remove the screws on the flat side of the
cover. Instead, remove the screws on the side of the
cover, allowing the entire cover to be removed.
Depending on the location, some covers may be
sealed with foam or another sealant.
The lift bolt assembly may be mounted vertically or
horizontally but will function the same way. Horizontally-
mounted lift bolts may not have a cover, depending on the
location within the coach.
4. Use a 13/16 wrench or socket to rotate the lift bolt(s) clockwise until they are seated in the receiver block.
Continue to turn the bolt(s) until the room is completely lifted. When there are multiple lift bolts, alternate evenly
between all lift bolts, turning each bolt two or three complete turns each time. Turning one lift bolt without
alternating may cause the room to bind.
IMPORTANT
Do not use an impact wrench to turn lift bolts.
© 2018 Copyright Newmar Corporation. All rights reserved. For the most up-to-date version of this content, and for more product-specific information, please refer to Newgle.
138