![Neptune 13458-000 Installation And Maintenance Manual Download Page 76](http://html1.mh-extra.com/html/neptune/13458-000/13458-000_installation-and-maintenance-manual_1668232076.webp)
Connecting the Cables to the Gateway
The RF antenna is attached to an outside structure and is
connected to the Gateway as follows.
Figure 75 – Adding Gateway Cables
1. Attach the RF antenna cable to the bottom of the unit.
See Figure 75.
2. Weatherize the RF antenna connection using the
weatherization kit, as described in "Recommended Tools
Do not weatherize the power connector. The power connector
is IP68-rated and does not require weatherization wrap.
Figure 76 – Power Connector
3. Attach the circular power connector to the Gateway by
pushing and rotating the connector clockwise to engage
it. See Figure 76.
Figure 77 – UPS Power Switch
4. Turn on the power switch inside the UPS to activate the
system. See Figure 77. Also see "Checking
UPS Status LEDs" on page 70 of the Installation
Troubleshooting section.
5. Install the cover on the UPS and secure it with two
screws.
58
R900 Gateway Installation and Maintenance Guide
Chapter 4: Installation of the Gateway
Summary of Contents for 13458-000
Page 2: ......
Page 3: ...R900 Gateway v4 Installation and Maintenance Guide...
Page 6: ...This page intentionally left blank...
Page 149: ......