![Neptune 13458-000 Installation And Maintenance Manual Download Page 51](http://html1.mh-extra.com/html/neptune/13458-000/13458-000_installation-and-maintenance-manual_1668232051.webp)
Figure 35 – Battery Box Installed
2. Hang the battery box without batteries on the upper
mounting bracket. See Figure 35.
3. Attach the lower bracket to the battery box using the
5/16-inch carriage bolts.
4. Tighten bolts using a 1/2-inch wrench to
10-12 ft.lbs. torque.
5. Check alignment of all assembled parts and tighten all
bolted connections.
For more detailed instructions, see
SunWize
®
Installation,
Operation, and Maintenance Manual
. (Part Number:
PM296038)
Figure 36 – Battery and Wiring
6. Install the battery in the battery box leaving
ventilation areas free of blockage.
7. Connect the B+ wire to the positive battery terminal.
Connect the B- wire to the negative battery terminal.
See Figure 36.
8. Remove the two knockouts in the back of the battery
box by tapping them with a flathead screwdriver and
a hammer. See Figure 35.
Apply corrosion inhibitor, for example NOCO Company's
NCP-2 (Non Corrosion Product) or Sanchem Inc.'s No-OX
ID Grease "A", to the battery terminals.
R900 Gateway Installation and Maintenance Guide
33
Chapter 4: Installation of the Gateway