![NEC mPD17120 Subseries User Manual Download Page 190](http://html.mh-extra.com/html/nec/mpd17120-subseries/mpd17120-subseries_user-manual_249259190.webp)
CHAPTER 16 RESET
175
Figure 16-3. Example of the Power-On Reset Operation
Notes
1.
During the operation-undefined period, certain operations on the
µ
PD17120 subseries are not
guaranteed. However, the power-on reset function is guaranteed in this period.
2.
The operation-guaranteed period refers to the time in which all the operations specified for the
µ
PD17120 subseries are guaranteed.
3.
An operation stop state refers to the state in which all of the functions of the microcontroller are
stopped.
A : Voltage at which
oscillation starts
B : Voltage at which the
power-on reset operation
terminates
V
DD
(V)
5.0
2.7
A
B
0
Time (t)
State of
oscillation
Period in which
the microcon-
troller is guar-
anteed to
operate
Power-on
reset signal
Operation state
of the micro-
controller
Oscillation stop
Oscillation start
Undefined
period
Note1
Operation
stop
Note 3
Oscillating
Timer finishes counting
Guaranteed period
Note 2
Operating mode
Power-on reset termination
Waiting until
oscillation
becomes stable
V
DD
GND
RESET
PD17120
Subseries
µ
Summary of Contents for mPD17120 Subseries
Page 15: ... x MEMO ...
Page 23: ... MEMO 8 ...
Page 45: ... MEMO 30 ...
Page 49: ... MEMO 34 ...
Page 55: ... MEMO 40 ...
Page 93: ... MEMO 78 ...
Page 99: ... MEMO 84 ...
Page 102: ...CHAPTER 11 ARITHMETIC AND LOGIC UNIT 87 MEMO ...
Page 119: ... MEMO 104 ...
Page 175: ... MEMO 160 ...
Page 199: ... MEMO 184 ...
Page 265: ... MEMO 250 ...
Page 281: ...266 MEMO ...
Page 285: ... MEMO 270 ...
Page 289: ... MEMO 274 ...