5-1
Before Installing (Both for
You
prepare
the necessary
items
to install this product as follows.
Items needed
Remarks
Reference
Operation manual attached to your cabinet
Check the handling of your cabinet.
Countersunk head tapping screw (4 pieces)
Fix the
on the install board of
Chapter 5-2
Diameter: one size smaller than the diameter of
your cabinet. You may use the furnished
(page 12)
installation hole on the side of
which ones with your cabinet.
on the install board.
L e n g t h :
Long enough to
the
on the install
board but not too long to stick through the
install board
(4 pieces)
Keep space between
install board and
Chapter 5-2
Those which have holes to be installed on the install
the PC board.
may use the furnished
(page
board and holes to install
PC board
ones with your cabinet.
Pan head machine screw (4 pieces)
Fix the PC board into the
You
Chapter 5-2
Diameter: appropriate size for
PC board installation
may use the furnished ones with your
hole (or
thread) of the
cabinet.
L e n g t h :
Not
long to stick through the
when the PC
is fixed. or not too short to
tix it on the
You can adjust the
length by using
spacer mentioned below in
cases the screws
too long.
Spacer (4 pieces)
Minor diameter.
size
for
the screws mentioned
L e n g t h :
appropriate sire to adjust the length of the
screws above.
Adjust the length of the pan head machine Chapter 5-2
screws when installing the PC board on
(page
the lesslocks. Not necessary unless the
pan head machine screws are too long.
You may use the furnished ones with your
cabinet.
Solder or caulking, or crimp-style terminal
Connect wires to micro switches. Please
Chapter 5-3-l
read the referential chapters to check if
(page
they
necessary or not.
chapter
5-3-3
16).
Chapter
5-34
Insulating heat contraction tube and a drier for heat
tube
Insulate the connection parts of the wires.
Chapter 5-3-l
Please read the referential chapters to
(page 13).
check whether they are necessary or not.
Chapter 5-3-3
(page 16)
tape
Insulate
edge of unnecessary wires
and connecton. Not necessary when
c o n n e c t i n g t o t h e c a b i n e t c o r r e s p o n d i n g
to
standard with 2
specification).
Chapter 5-34
Chapter 54-2
(page
Summary of Contents for Tekken Tag Tournament
Page 1: ......
Page 56: ...11 APPENDIX A Control Panel Layout Template Electrical Diagram 54...
Page 58: ...00 ti OG Z 00 0 66 0 6 1...
Page 59: ...3...