
3D TRASAR
5500 - Installation & Operation Manual
521-OM0108.88
Copyright
2009 Nalco Company
Technical Help
(630) 305-CHEM
F-7
3D TRASAR Starter ORP Upgrade Procedure
2. Install New Hardware
Install the ORP probe as follows:
STEP 1
-
Carefully unpack the ORP probe.
STEP 2
-
Apply 5 revolutions of Teflon tape
to the ORP probe threads.
STEP 3
-
Hand tighten the probe in the
threaded tee location indicated in
drawing at right.
STEP 4
-
Connect ORP probe to ORP
cable (cable is labeled ORP.)
STEP 5 -
With power off, wire ORP cable
to proper terminals in controller
box (see drawing below.)
STEP 6
-
Reconfigure the controller for
ORP.
1. Order Upgrade
Order the 3D TRASAR Starter ORP Upgrade,
P/N 060-TR3221.88
(includes ORP probe, cable and
installation instructions.) Order through Nalco customer service, or through the Order Wizard.