![NAiS FP0 Series Hardware Manual Download Page 69](http://html1.mh-extra.com/html/nais/fp0-series/fp0-series_hardware-manual_3134824069.webp)
Expansion I/O Units
FP0
3 - 23
Matsushita Automation Controls
3.4 Pin Layouts
3.4.6
E32P
E32P
X28
Y28 Y29
X29
X20 X21
Y21
Y20
COM
COM
(-)
(+)
(+) (-)
Input
Input
Output
Output
(-)
(-)
(+)
(+)
(
*
Note 1)
X20 X21
X22 X23
X24 X25
X26 X27
COM COM
X28 X29
X2A X2B
X2C X2D
X2E X2F
COM COM
Y20 Y21
Y22 Y23
Y24 Y25
Y26 Y27
Y28 Y29
Y2A Y2B
Y2C Y2D
Y2E Y2F
.
Notes
D
The four COM terminals of input terminals are connected
internally, however they should be externally connected as
well.
D
The two (+) terminals of output terminals are connected
internally, however they should be externally connected as
well.
D
The two (-) terminals of the output terminals are internally
connected, however they should be externally connected as
well.
D
(
*
1): Either positive or negative polarity is possible for the input
voltage supply.
D
The I/O number given above is the I/O number when the
expansion I/O unit is installed as the first expansion unit.
The I/O numbers for the expansion I/O units will differ
depending on the location where they are installed
(
*
section 5.3).
Summary of Contents for FP0 Series
Page 1: ...PROGRAMMABLE CONTROLLER FP0 Hardware is a global brand name of Matsushita Electric Works...
Page 12: ...Overview FP0 1 2 Matsushita Automation Controls...
Page 20: ...Overview FP0 1 10 Matsushita Automation Controls 1 4 Programming Tools...
Page 76: ...Analog I O Unit FP0 4 2 Matsushita Automation Controls...
Page 94: ...Analog I O Unit FP0 4 20 Matsushita Automation Controls 4 7 Averaging Function...
Page 96: ...I O Allocation FP0 5 2 Matsushita Automation Controls...
Page 102: ...Installation FP0 6 2 Matsushita Automation Controls...
Page 114: ...Wiring FP0 7 2 Matsushita Automation Controls...
Page 134: ...Wiring FP0 7 22 Matsushita Automation Controls 7 9 Wiring the RS232C Port...
Page 136: ...Connecting the I O P Display Panel FP0 8 2 Matsushita Automation Controls...
Page 141: ...Chapter 9 Trial Operation 9 1 Before Turning ON the Power 9 3 9 2 Turning the Power ON 9 4...
Page 142: ...Trial Operation FP0 9 2 Matsushita Automation Controls...
Page 146: ...Self Diagnostic and Troubleshooting FP0 10 2 Matsushita Automation Controls...
Page 160: ...Self Diagnostic and Troubleshooting FP0 10 16 Matsushita Automation Controls 10 3 Error Codes...
Page 162: ...Dimensions FP0 A 2 Matsushita Automation Controls...
Page 172: ...Record of changes FP0 R 2 Matsushita Automation Controls...