Wiring
FP0
7 - 4
Matsushita Automation Controls
7.1 Safety Instructions
7.1.4
Momentary Power Failures
If the duration of the power failure is less than 5 ms, the FP0 continues to operate. If
the power is OFF for 5 ms or longer, operation changes depending on the combination
of units, the power supply voltage, and other factors. (In some cases, operation may
be the same as that for a power supply reset.)
If operation is to be continued following recovery from the momentary power failure, use
an automatic retaining sequence program that uses a hold type internal relay.
7.1.5
Protecting Power Supply and Output Sections
An insulated power supply with an internal protective circuit should be used. The power
supply for the control unit operation is a non-insulated circuit, so if an incorrect voltage
is directly applied, the internal circuit may be damaged or destroyed. If using a power
supply without a protective circuit, power should be supplied through a protective
element such as a fuse.
If current exceeding the rated control capacity is being supplied in the form of a motor
lock current or a coil shorting in an electromagnetic device, a protective element such
as a fuse should be attached externally.
Summary of Contents for FP0 Series
Page 1: ...PROGRAMMABLE CONTROLLER FP0 Hardware is a global brand name of Matsushita Electric Works...
Page 12: ...Overview FP0 1 2 Matsushita Automation Controls...
Page 20: ...Overview FP0 1 10 Matsushita Automation Controls 1 4 Programming Tools...
Page 76: ...Analog I O Unit FP0 4 2 Matsushita Automation Controls...
Page 94: ...Analog I O Unit FP0 4 20 Matsushita Automation Controls 4 7 Averaging Function...
Page 96: ...I O Allocation FP0 5 2 Matsushita Automation Controls...
Page 102: ...Installation FP0 6 2 Matsushita Automation Controls...
Page 114: ...Wiring FP0 7 2 Matsushita Automation Controls...
Page 134: ...Wiring FP0 7 22 Matsushita Automation Controls 7 9 Wiring the RS232C Port...
Page 136: ...Connecting the I O P Display Panel FP0 8 2 Matsushita Automation Controls...
Page 141: ...Chapter 9 Trial Operation 9 1 Before Turning ON the Power 9 3 9 2 Turning the Power ON 9 4...
Page 142: ...Trial Operation FP0 9 2 Matsushita Automation Controls...
Page 146: ...Self Diagnostic and Troubleshooting FP0 10 2 Matsushita Automation Controls...
Page 160: ...Self Diagnostic and Troubleshooting FP0 10 16 Matsushita Automation Controls 10 3 Error Codes...
Page 162: ...Dimensions FP0 A 2 Matsushita Automation Controls...
Page 172: ...Record of changes FP0 R 2 Matsushita Automation Controls...