Trial Operation
FP0
9 - 4
Matsushita Automation Controls
9.2 Turning the Power ON
9.2
Turning the Power ON
After checking the items given in the previous page, perform the trial operation by
following procedure.
Procedure:
1.
Before turning ON the power, check the items
described on the previous page
2.
Turn ON the power
3.
Check that the control unit’s PROG. LED is ON
4.
Enter the program
When using a programming tool, perform the operation “Clear Program”
before inputting. Enter the program using NPST-GR software or the FP
programmer
II
Ver.2. Use the proramming tool’s “total check function” to
check for syntax errors.
5.
Check output wiring
Use the forced output function to check the output wiring.
6.
Check input wiring
Check the input wiring by watching the ON/OFF status of the input state
LEDs or by using the monitoring function of the programming tool.
7.
Switch the mode switch from PROG. to RUN mode
8.
If the RUN LED turns ON, check the operation of the
program
9.
Edit the program (debug) if necessary
If there is an error in the operation, check the program using the monitoring
function of the programming tool. And then correct the program.
10.
Save the edited program
We highly recommend to save the created program onto a floppy disk.
Summary of Contents for FP0 Series
Page 1: ...PROGRAMMABLE CONTROLLER FP0 Hardware is a global brand name of Matsushita Electric Works...
Page 12: ...Overview FP0 1 2 Matsushita Automation Controls...
Page 20: ...Overview FP0 1 10 Matsushita Automation Controls 1 4 Programming Tools...
Page 76: ...Analog I O Unit FP0 4 2 Matsushita Automation Controls...
Page 94: ...Analog I O Unit FP0 4 20 Matsushita Automation Controls 4 7 Averaging Function...
Page 96: ...I O Allocation FP0 5 2 Matsushita Automation Controls...
Page 102: ...Installation FP0 6 2 Matsushita Automation Controls...
Page 114: ...Wiring FP0 7 2 Matsushita Automation Controls...
Page 134: ...Wiring FP0 7 22 Matsushita Automation Controls 7 9 Wiring the RS232C Port...
Page 136: ...Connecting the I O P Display Panel FP0 8 2 Matsushita Automation Controls...
Page 141: ...Chapter 9 Trial Operation 9 1 Before Turning ON the Power 9 3 9 2 Turning the Power ON 9 4...
Page 142: ...Trial Operation FP0 9 2 Matsushita Automation Controls...
Page 146: ...Self Diagnostic and Troubleshooting FP0 10 2 Matsushita Automation Controls...
Page 160: ...Self Diagnostic and Troubleshooting FP0 10 16 Matsushita Automation Controls 10 3 Error Codes...
Page 162: ...Dimensions FP0 A 2 Matsushita Automation Controls...
Page 172: ...Record of changes FP0 R 2 Matsushita Automation Controls...