![MV Agusta Rivale 800 Workshop Manual Download Page 31](http://html.mh-extra.com/html/mv-agusta/rivale-800/rivale-800_workshop-manual_1860725031.webp)
Maintenance
- 15 -
B
ELECTRIC COOLING FAN
Check
→
on pre-delivery and at the first 1000
kilometres and then every 6000 kilome-
tres.
To carry out the check on the functioning of the electric
cooling fan, switch on the engine and heat it up.
The electric fan must start up when the water temper-
ature reaches the 5th or 6th notch on the dashboard.
If the electric cooling fan do not switch on, carry out the
checks on the various components as described in
chapter L “Cooling system”.
VALVE MECHANISM ADJUSTMENT
Check and adjust
Every 12000 kilometres
Tappet play must be adjusted with the
engine cold.
Remove in order the following components to carry out
the measuring of the play between the camshaft and the
valve cups as described in sections C - "Superstructures"
and G - "Frame":
• Saddle
• Fuel tank side panels
• Air inlet side panels (right and left)
• Saddle side panels
• Rear side panels (right and left)
• Side number holder
• Airbox
• Throttle body
NOTE
: For all removal operations, including the relative
attention notes, please refer to the specific sections in
this manual.
An analogous reference is utilised for the reassembly
of the parts after the maintenance operation.
Summary of Contents for Rivale 800
Page 1: ......
Page 3: ...Motorcycle workshop manual MV AGUSTA RIVALE 800...
Page 6: ......
Page 7: ...1 General description A SECTION A Revision 0...
Page 16: ...10 General description A...
Page 17: ...B 1 Maintenance SECTION B Revision 0...
Page 41: ...Maintenance 25 B FUEL PUMP ASSEMBLY...
Page 108: ...92 Maintenance B...
Page 109: ...1 Superstructures C SECTION C Revision 0...
Page 111: ...Superstructures 3 C FAIRINGS...
Page 128: ...20 Superstructures C RADIATOR SIDE PANELS...
Page 131: ...Superstructures 23 C INTAKE AIR SYSTEM AIRBOX...
Page 136: ...28 Superstructures C REAR TAIL...
Page 137: ...Superstructures 29 C LOWER BULKHEAD AND TAIL LIGHT...
Page 149: ...Superstructures 41 C...
Page 152: ...44 Superstructures C...
Page 153: ...Air intake injection system 1 D SECTION D Revision 0...
Page 181: ...Electrical system 1 E SECTION E Revision 0...
Page 236: ...56 Electrical system E Code Code Code Code Code Code...
Page 245: ...1 F Suspension and wheels SECTION F Revision 0...
Page 315: ...Frame 1 G SECTION G Revision 0...
Page 318: ...4 Frame G Remove the battery from its compartment Disconnect the positive pole of the battery...
Page 351: ...Frame 37 G...
Page 361: ...H 1 Brakes SECTION H Revision 0...
Page 365: ...Brakes 5 H Remove the pads pin 2 Slide the safety plate out 3 Remove the two pads 4 2 3 4...
Page 392: ...32 Brakes H...
Page 393: ...L 1 Cooling system SECTION L Revision 0...
Page 431: ...Special tools 1 M SECTION M Revision 0...
Page 434: ...Special tools M 4...
Page 436: ...Special tools M 6...
Page 438: ...Special tools M 8...
Page 439: ...1 Tightening torques N SECTION N Revision 0...
Page 440: ...2 Tightening torques N...
Page 441: ...Tightening torques 3 N...
Page 442: ...4 Tightening torques N...
Page 443: ...Diagnostic 1 O SECTION O Revision 0...
Page 451: ...Analytical index 1 P SECTION P Revision 0...
Page 455: ......
Page 456: ......