Table of contents
4.1.3.1. Setting the machine’s working width . . . . . . . . . . . . . . . . . . .
4.1.3.2. Setting the value of advance . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.3.3. Resetting the area counter . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.3.4. Switching power on and off . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1.9. Turning the rear railing of the working platform and attaching the
5.3.1. Adjusting the wheel packer boom length . . . . . . . . . . . . . . . . . . . . . . . . . .
Operation and maintenance
manual
Cerex 300
1.00
1 (156)
Summary of Contents for Cerex 300 SeedPilot
Page 159: ...Hydraulic schematic Appen dix 2 Cerex 300 1 Appendix 2 Hydraulic schematic...
Page 160: ...Hydraulic schematic Appen dix 2 Cerex 300 2...
Page 161: ...Electrical Diagram Annex 3 Cerex 300 1 Annex 3 Electrical Diagram...
Page 162: ...Electrical Diagram Annex 3 Cerex 300 2...