2909
2910
Figure. 5.1.9. - 37. Attaching the end railing of the working platform
Number
Component
Quantity
1.
Locking nut M8
4 pcs
2.
Washer M8
4 pcs
3.
U-bolt
2 pcs
4. Attach the end railing to the working platform with washers (2), U-bolt (3) and locking
nuts (1).
5. Repeat step 4 for the second attachment point.
5.2. Commissioning
5.2.1. Installing the Lykketronic area counter
Figure. 5.2.1. - 38. Installing the area counter
Operation and maintenance
manual
1.00
Cerex 300
48 (156)
Summary of Contents for Cerex 300 SeedPilot
Page 159: ...Hydraulic schematic Appen dix 2 Cerex 300 1 Appendix 2 Hydraulic schematic...
Page 160: ...Hydraulic schematic Appen dix 2 Cerex 300 2...
Page 161: ...Electrical Diagram Annex 3 Cerex 300 1 Annex 3 Electrical Diagram...
Page 162: ...Electrical Diagram Annex 3 Cerex 300 2...