Figure. 5.1.1. - 24. Connecting the hydraulic hoses
1.
Green, one mark Hydraulic cylinder, cylinder extend
2.
Green, two
marks
Hydraulic cylinder, cylinder retract
3.
Blue, one mark
Coulter weight, decreasing the coulter weight
4.
Blue, two marks
Coulter weight, increasing the coulter weight
5.
Red, one mark
Vertical movement of the seed and fertiliser drill, cylinder
extend
6.
Red, two marks
Vertical movement of the seed and fertiliser drill, cylinder
retract
10. Connect the hydraulic hoses 3-6.
Connect the hydraulic hoses of the tow bar cylinder only when the tow bar
cylinder is installed.
11. Push the hoses back towards the tow bar to eliminate slack and tighten the tube mounts
and cable ties.
12. Attach the electrical wires contained in a protective tube to the hydraulic hoses with
cable ties and guide the wires to the right side of the seed and fertiliser drill (viewed from
the front).
13. Check the tow bar cylinder in accordance with section 5.1.2. MOUNTING THE TOW BAR
Operation and maintenance
manual
Cerex 300
1.00
37 (156)
Summary of Contents for Cerex 300 SeedPilot
Page 159: ...Hydraulic schematic Appen dix 2 Cerex 300 1 Appendix 2 Hydraulic schematic...
Page 160: ...Hydraulic schematic Appen dix 2 Cerex 300 2...
Page 161: ...Electrical Diagram Annex 3 Cerex 300 1 Annex 3 Electrical Diagram...
Page 162: ...Electrical Diagram Annex 3 Cerex 300 2...