USER MANAUL
MGA
prime Q
MRU GmbH, D-74172 Neckarsulm
73 /
117
The time of the next automatic device start is taken over and
shown in the display.
If you have activated an automatic device start, a message appears when
the analyser is switched off.
►
Pull the heating hose out of the analyser.
►
Pull the probe out of the analyser.
►
Press Yes.
The system will shut down.
After the analyser has shut down, an LED lights up to in dicate that an
automatic device start has been set
8.6.
Instrument leak test
The analyser device has an integrated leak test to check the tightness of
the gas paths.
►
Check all plug connections for correct fit.
►
Check all hoses and hose connections (from the probe tip to the gas
inlet of the analyser) for leaks.
►
Open the menu Extras.
See also chapter 8.1 Open menu Extras, Page 68.
►
Press Instrument leak test.
A window appears.
If the analyser is still in the warm-up phase, no leak test can be
performed. A corresponding message is displayed.