USER MANAUL
MGA
prime Q
MRU GmbH, D-74172 Neckarsulm
52 /
117
Perform leak test
The analyser device has an integrated leak test to check the tightness of
the gas paths.
►
Check all plug connections for correct fit.
►
Check all hoses and hose connections (from the probe tip to the gas
inlet of the analyser) for leaks.
►
Go to menu Extras.
A selection list appears.
►
Select Instrument leak test.
A window appears.
If the analyser is still in the warm-up phase, no leak test can be
performed. A corresponding message is displayed.
►
Press OK.
►
Wait until the warm-up phase is completed.