USER MANAUL
MGA
prime Q
MRU GmbH, D-74172 Neckarsulm
53 /
117
NOTE
Please note that no leak test can be performed with a
connected Acid Dosing Unit APE. The Acid Dosing Unit
APE is connected to the analyser via a connecting hose
with two couplings.
►
Remove the two couplings from the analyser.
Leak test is available.
►
Press START LEAK TEST
A message appears.
►
Confirm with YES, that the APE tubes are removed.
►
Seal the gas port.
The leak test is performed.
Or if the complete gas path is to be checked for leaks:
NOTE
With dirt and soot particles on the probe tube the test cap
will not seal properly
.
►
The probe tip must be cleaned before you start this test!
►
Seal off the tip of the probe with a leak proof test cap.
If the system is tight, the traffic light is green and the l/h pointer is
0.
►
Connect the Acid Dosing Unit APE to the analyser