USER MANAUL
MGA
prime Q
MRU GmbH, D-74172 Neckarsulm
47 /
117
►
Unroll the heating hose.
►
Connect the heating hose.
The heating hose heats up.
Opening the transport bag
►
Open the transport bag to get access the control panel (1).
►
Open the transport bag to get access to the left side. (2).
►
Open the ventilation flap (3).
Connections to the analyser
See also Chapter 3.4 Connectors, page 14.
►
Connect the gas sampling probe to Sample gas inlet port (12) (gas
coupling and round plug).
►
Note that acidic condensate as well as phosphoric acid is discharged
from the condensate out port (9). Consider to connect a hose or
collecting container to the condensate outlet when
appropriate. Ensure that the empty volume of the collection
container is sufficient (24ml/h). The hose must not be closed and the
collection container must have a ventilation opening.
►
Please note that measuring gas may leak at the analyser side or at
the Sample gas outlet port (10)
ATTENTION
When measuring with coiled heated hose line, the hose
line is destroyed due to strong heat development.
►
Roll out the heated hose line completely for each
measurement.