USER MANAUL
MGA
prime Q
MRU GmbH, D-74172 Neckarsulm
20 /
117
1
Power-on / off
2
not used
3
not used
4
LED display mains opera-
tion/battery charging mode
5
not used
6
Current flow rate
6a Current pump load
7
Current temperatures
heated hose
8
Selected measuring pro-
gram, e.g., Test or measure-
ment program
8a APE
9
Current temperatures of
NDIR bench
10 Current temperatures of gas
cooler 1
10a Current temperatures of gas
cooler 2
11 Access to detailed infor-
mation on the instrument
components.
Especially for service or in-
quiry
12 Menu Sites
13 Menu Measure
14 Status bar: display of zero
point, alarms, executed
measuring pro-gram, se-
lected fuel, heat-up-, cool-
down phase
15 Menu Settings
16 Menu Extras
17 Menu Info
18 Battery Charge indicator
19 Context menu with window-
dependent additional func-
tions
NOTE
For display reasons, the Service menu is missing from
the description of the operating panel.
4.3.
Charging the battery
The analyser has an integrated rechargeable battery.
►
Connect the mains plug.
The battery will be charged as soon as it is connected to the
mains.
The blue LED (4) lights up.
►
Charge battery for more than 8h is recommended after first start to
allow the battery to charge completely.