Page 69
07 - Maintenence & Care
3. Remove grid floor
Carefully remove the grid floor. Gloves
are recommended for this cleaning step.
Take care not to bend the grid floor during
cleaning. Then reassemble your Mr Beam in
reverse order. Finally, make sure that all
screws are tightened.
Mr Beam may only be operated when fully
assembled.
2. Remove base plate
Carefully remove the bottom plate.
1. Loosen screws
Shut down and switch off your Mr Beam.
Then remove the air hose and all other
connections to your Mr Beam. Place your
Mr Beam with the front side on a stable
table and place a cloth underneath to
prevent scratches. Unscrew all screws at
the bottom plate with a 2mm (5/64 inch)
Allen key. Wear gloves at all work steps to
avoid injuries.
GENERAL CLEANSING
Summary of Contents for Dreamcut II
Page 1: ...dreamcut U S E R M A N U A L 2019 Mr Beam Lasers GmbH Munich 01 November 2019 Revision 1 1 EN ...
Page 3: ......
Page 6: ......
Page 10: ......
Page 19: ...Page 13 02 Safety Conformity ...
Page 22: ......
Page 27: ...AIR FILTER SYSTEM Page 21 03 Components Overview CONNECTIONS Network connection Ethernet ...
Page 31: ...Page 25 03 Components Overview ...
Page 32: ......
Page 50: ......
Page 56: ......
Page 61: ...Page 55 06 Working with your Mr Beam ...
Page 62: ......
Page 79: ...Page 73 07 Maintenence Care ...
Page 80: ......
Page 81: ...ADDITIONAL INFORMATION 08 Chapter ...
Page 85: ...Page 79 08 Additional Information ...
Page 86: ......
Page 87: ...GENERAL TERMS AND CONDITIONS 09 Chapter ...
Page 90: ... 2019 Mr Beam Lasers GmbH Gollierstraße 70 Munich info mr beam org www mr beam org ...