
Link planning
Chapter 2 Planning considerations
phn-2182_002v000
2-8
May 2011
Link planning
This section describes factors to be taken into account when planning links, such as
range, obstacles and path loss. PTP LINKPlanner is recommended.
Range and obstacles
Calculate the range of the link and identify any obstacles that may affect radio
performance.
Perform a survey to identify all the obstructions (such as trees or buildings) in the path
and to assess the risk of interference. This information is necessary in order to achieve
an accurate link feasibility assessment.
NOTE
When higher gain connectorized antennas are used, reduce the transmit
power to ensure that the receiver signal level does not exceed -20 dBm.
PTP LINKPlanner
The Motorola PTP LINKPlanner software and user guide may be downloaded from
http://www.motorola.com/ptp/support.
PTP LINKPlanner imports path profiles and predicts data rates and reliability over the
path. It allows the system designer to try different antenna heights and RF power
settings. It outputs an installation report that defines the parameters to be used for
configuration, alignment and operation. The installation report can be used to compare
the predicted and actual performance of the link.
Summary of Contents for Motorola PTP 250
Page 20: ...List of Tables phn 2182_002v000 xiv May 2011 ...
Page 30: ......
Page 80: ...Data network planning Chapter 2 Planning considerations phn 2182_002v000 2 22 May 2011 ...
Page 126: ...Notifications Chapter 4 Reference information phn 2182_002v000 4 36 May 2011 ...
Page 234: ...Testing the radio link Chapter 8 Troubleshooting phn 2182_002v000 8 14 May 2011 ...