
PTP 250 User Guide
Spectrum planning
phn-2182_002v000
May 2011
2-3
Frequency selection
The PTP 250 fully conforms to regional regulatory requirements for radar avoidance.
In regions that mandate DFS, the unit first ensures that there is no radar activity on a
given channel for a period of 60 seconds before radiating on that channel. Once a
channel has been selected for operation, the unit will continually monitor for radar
activity on the operating channel. If detected, it will immediately cease radiating and
attempt to find a new channel.
Radar avoidance requirements in the 5.4 GHz band are defined as follows:
x
For the EU: in specification EN 301-893 version V1.5.1.
Radar avoidance at 5.8 GHz is applicable to EU operation (not FCC/IC) and the
requirements are defined in EN 302 502.
Channel width
Select the required channel width for the link (20 MHz or 40 MHz). The wider channel
has the greater the capacity. As narrower channel widths take up less spectrum,
selecting a narrow channel width may be a better choice when operating in locations
where the spectrum is very busy.
Summary of Contents for Motorola PTP 250
Page 20: ...List of Tables phn 2182_002v000 xiv May 2011 ...
Page 30: ......
Page 80: ...Data network planning Chapter 2 Planning considerations phn 2182_002v000 2 22 May 2011 ...
Page 126: ...Notifications Chapter 4 Reference information phn 2182_002v000 4 36 May 2011 ...
Page 234: ...Testing the radio link Chapter 8 Troubleshooting phn 2182_002v000 8 14 May 2011 ...