
PTP 250 User Guide
Connecting to the unit
phn-2182_002v000
May 2011
6-5
Connecting to the PC and powering up
CAUTION
Ensure AC power is supplied to the PoE power supply using an AC cable
with an appropriate ground connection approved for the country of
operation.
To connect the ODU to the PC and power up the unit, proceed as follows:
1
Check that the ODU and PoE power supply are correctly connected.
2
Connect the PC Ethernet port to the DATA IN port of the PoE power
supply using a standard (not crossed) Cat5e cable (
Figure 6-3
).
3
Connect the PoE power supply to an AC outlet (100 V AC to 240 V AC).
NOTE
The PoE power supply has no power switch. It supplies power to the
ODU as soon as AC power is applied.
4
Check that the AC and PORT LEDs illuminate (green steady). If they blink
or do not illuminate, refer to
Testing link end hardware
on page
8-2
.
Figure 6-3
PoE power supply connected to ODU and PC (or network)
Summary of Contents for Motorola PTP 250
Page 20: ...List of Tables phn 2182_002v000 xiv May 2011 ...
Page 30: ......
Page 80: ...Data network planning Chapter 2 Planning considerations phn 2182_002v000 2 22 May 2011 ...
Page 126: ...Notifications Chapter 4 Reference information phn 2182_002v000 4 36 May 2011 ...
Page 234: ...Testing the radio link Chapter 8 Troubleshooting phn 2182_002v000 8 14 May 2011 ...