MAR2-E-191
33
4.
MECHANICAL AND ELECTRICAL INSTALLATION
4.1.
Tools and instruments
Tools:
Keep the following tools available to install the modules:
•
Tork T25 screwdriver (fixing connecting BUS BAR of the power supply)
•
M4 crosshead srewdriver (for fixing DM2020 power supplies to the wall)
•
M3 crosshead screwdriver (BUSBAR protection of the power supply
•
Tool for M4 screws (fixing the DR2020 to the machine)
Instruments:
No specific instruments are necessary. However a digital multimeter is advisable, to check voltage,
continuity, make comparisons and take readings.
4.2.
Mechanical installation
4.2.1.
Assembly of components
INFORMATION
DR2020 modules have been designed and manufactured for vertical assembly, with a clearance of at least 100 mm
above and below, to ensure sufficient air circulation
4.2.1.1.
Assembling the power supply
Standard vertical assembly.
Assembly material: 2 M6 cheese-headed screws.
In the case of horizontal assembly, please contact the Applications Department to verify the application.
4.2.1.2. Assembling the DR2020 axes
Standard vertical assembly.
Assembly material: 2 M6 cheese-headed screws.
In the case of horizontal assembly, please contact the Applications Department to verify the application.
4.2.1.3. EMC Filter installation
To install filters, follow the instructions for installing the drives.
4.2.1.4.
Inductor
installation
4.2.1.5. Positioning of brake resistors
Position at the top of the distribution board to facilitate the loss of heat produced.
Installation with brackets supplied for a standard resistor.
Installation on the heat sink (not supplied) for the optional resistor (armoured).
INFORMATION
When these are to be used, given their considerable weight, install the inductors at the bottom of the cabinet,
if possible near the EMC ilter, to reduce emissions in the distribution board