Fusion Compact Pro Bread Plant, Rev. A21 14-04-21
74
5.0 INSTALLATION
1
The Metro moulder should be connected to a socket on the prover.
2
Check the machine after installation to ensure the conveyor belt runs
in the right direction (see direction of arrow below). This should be
done by “inching” the motor.
If the motor rotation is incorrect transpose any two wires of the three
phase carrying wires.
3
Ensure the machine is standing on a solid level floor.
Note
The Metro will only work if connected to a breadplant
or a safety hopper is fitted.
CONVEYOR BELT
DIRECTION
POWER SOCKETS
Summary of Contents for Fusion Compact PRO
Page 4: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 2...
Page 10: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 8 BREADPLANT ASSEMBLED SECTION 1...
Page 60: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 58...
Page 61: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 59...
Page 62: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 60...
Page 63: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 61...
Page 64: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 62 YASKAWA INVERTER DEFAULT SETTINGS...
Page 67: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 65 ELECTRICAL DISTRIBUTION...
Page 68: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 66 CONTROL CIRCUIT...
Page 87: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 85...
Page 88: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 86 11 0 ELECTRICAL INFORMATION...
Page 89: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 87...
Page 90: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 88...
Page 102: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 100 11 0 ELECTRICAL INFORMATION...
Page 103: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 101...
Page 104: ...Fusion Compact Pro Bread Plant Rev A21 14 04 21 102...
Page 105: ......