IS-120B
10. Specifications
10-2
ms mode
CYC mode
①
SQD /
Squeeze
delay time
0000-9999
ms
000-999CYC
15
schedules
②
SQZ /
Squeeze time
0000-9999
ms
000-999CYC
15
schedules
③
WE1 /
Weld 1 time
000-600ms 00-30CYC
15
schedules
④
UP SLOPE /
Up-slope time
000-400ms 00-20CYC
(Included in Weld 1 time)
15
schedules
⑤
COOL /
Cooling time
000-999ms
00-99CYC
15
schedules
⑥
WE2 /
Weld 2 time
000-600ms
00-30CYC
15
schedules
⑦
DOWN SLOPE /
Down-slope time
000-400ms 00-20CYC
(Included in Weld 2 time)
15
schedules
⑧
HOLD /
Hold time
000-999ms
00-99CYC
15
schedules
Timer settings
(SCHEDULE screen)
⑨
OFF /
Off time
0010-9990ms 00-99CYC 15
(
10ms-step setting
)
schedules
No repeat operation if set to 0.
15 schedules HIGH range LOW range
Secondary current
setting range (HEAT)
①
Constant-current control
②
Constant-power control
③
Constant-voltage control
④
Constant-phase control
00.1-20.0kA 0.10-9.99kA
00.1-20.0kW
0.10-9.99kW
0.10-9.99V 0.10-9.99V
10.0-99.9%
10.0-99.9%
Set as follows:
Secondary current setting (
HEAT
)
Transformer turn ratio setting (
P/S RATIO
)
Primary current
control range
However, for primary constant-current peak value control, set
the above ratio to
≻
5A and
≦
200A.
Transformer turn
ratio
setting (P/S
RATIO)
2 schedules
Setting range: 1.0-199.9
Pulsation setting
(PULSATION)
Setting range: 1-9
1-9
HEAT INCREASE/
Step-up ratio
50-200% 15 schedules
Step-up(-down)
setting
STEPPER COUNT/
Step-up counter
0000-9999 times 2 schedules
(Corresponding to
VALVE
)
≦
200A