IS-120B
4. How to Operate Screens
4-12
-COPY
SETUP
DATA
IS-120B
----->
MA-627A
(MEMORY
1)
IS-120B
----->
MA-627A
(MEMORY
2)
IS-120B
<-----
MA-627A
(MEMORY
1)
IS-120B
<-----
MA-627A
(MEMORY
2)
SCHEDULE
[01]
----->
SCHEDULE
[01]-[01]
This screen shows initial settings.
Move the cursor
(→)
to a necessary item among
(
a
)
to
(
d
)
, then press
[
ENTER
]
key
; the data will be copied.
(
a
)
IS-120B --
>
MA-627A
(
MEMORY 1
)
The data in
IS-120B
are copied to MEMORY 1 of
MA-627A
.
(
b
)
IS-120B --
>
MA-627A
(
MEMORY 2
)
The data in
IS-120B
are copied to MEMORY 2 of
MA-627A
.
(
c
)
IS-120B
<
-- MA-627A
(
MEMORY 1
)
The data in MEMORY 1 of
MA-627A
are copied to
IS-120B
.
(
d
)
IS-120B
<
-- MA-627A
(
MEMORY 2
)
The data in MEMORY 2 of
MA-627A
are copied to
IS-120B
.
(
e
)
SCHEDULE
[
01
]
--
>
SCHEDULE
[
01
]
-
[
01
]
This function is used to copy the
SCHEDULE
(
welding condition
)
.
IS-120B
can set up to 15 schedules. They are indicated as
SCHEDULE #1
-
#15
.
This function is also used to "change the setting of
SCHEDULE #1
and perform
welding according to another schedule".
For an example,
SCHEDULE #2
can be set by modifying
SCHEDULE #1
as
follows:
SCHEDULE
[
01
]
--
>
SCHEDULE
[
02
]
-
[
02
]
(
Be sure to press the
[
ENTER
]
key
before moving the cursor
)
Move the cursor to the left of the letters of
SCHEDULE
and press the
[
ENTER
]
key
.
The data of
SCHEDULE #1
are copied to
SCHEDULE
#2
by this operation.
Call #2 on the
SCHEDULE screen
, and change the values, if necessary.
For another example,
SCHEDULE #1
can be copied to
SCHEDULE #2
through
SCHEDULE #4
at once by setting:
SCHEDULE
[
01
]
--
>
SCHEDULE
[
02
]
-
[
04
]
(a)
(b)
(c)
(d)
(e)