161
CHAPTER 9 PROGRAMMING
9
9.3 Pr
ogram Example
(5) Setting procedure
Connect GX Works2 to the master station to set up the settings.
1.
Create a project on GX Works2.
For "PLC Series", select "QCPU (Q mode)" and for "PLC Type", select "Q10UDH".
[Project]
[New...]
2.
Open the network parameter setting window and configure the settings as shown below.
Project window
[Parameter]
[Network Parameter]
[Ethernet/CC IE/MELSECNET]
Summary of Contents for NZ2EX2B-60AD4
Page 2: ......
Page 49: ...47 CHAPTER 4 PROCEDURES BEFORE OPERATION 4 Memo ...
Page 156: ...154 3 In the dialog box that appears shown below click button ...
Page 169: ...167 CHAPTER 10 MAINTENANCE AND INSPECTION 10 Memo ...
Page 253: ......