![Mitsubishi Electric MELSEC Q80BD-J71GF11-T2 User Manual Download Page 65](http://html.mh-extra.com/html/mitsubishi-electric/melsec-q80bd-j71gf11-t2/melsec-q80bd-j71gf11-t2_user-manual_238449065.webp)
5 FUNCTIONS
5.2 Cyclic Transmission
63
5
Link scan and link refresh
Link scan is executed 'asynchronously' with the link refresh which is executed by the CC-Link IE Field Network board driver.
Setting method
Link refresh is executed at the interval of time set for "Link refresh cycle" on the "Driver setting" screen of CC IE Field Utility.
(
Link refresh time
Link refresh time can be checked on the "Board Diagnostics" screen. (
The link refresh may not be executed in the set cycle because of such factors described below.
• Performance of the personal computer CPU
• Number of set refresh points
• Number of installed CC-Link IE Field Network boards
• Other running applications
• Other running boards
• If the link refresh time exceeds the link refresh cycle set on the "Device setting" screen, extend the link
refresh cycle. (
• If the shortened link refresh time effects the operation of the applications, extend the link refresh cycle.
(
Link refresh time
Link scan
(Setting time)
(Setting time)
(Setting time)
(Setting time)
Link refresh
Link refresh
Link refresh
Summary of Contents for MELSEC Q80BD-J71GF11-T2
Page 2: ......
Page 6: ...4 Disposal Precautions CAUTION When disposing of this product treat it as industrial waste ...
Page 118: ...116 12 MONITORING MEMO ...
Page 140: ...138 14 MELSEC DATA LINK LIBRARY MEMO ...
Page 142: ...140 15 PROGRAMMING 15 1 Precautions on Programming MEMO ...
Page 243: ...241 I U Utility 83 ...
Page 247: ......