4 PROCEDURE BEFORE OPERATION
4.5 Tests Before Wiring (Standalone Tests of the Board)
47
4
4.5
Tests Before Wiring (Standalone Tests of the
Board)
This section explains the CC-Link IE Field Network board tests before network wiring.
Ethernet cable
Do not connect an Ethernet cable to the CC-Link IE Field Network board in testing a board alone. Doing so
may cause the test to fail.
Bus I/F test
Bus I/F test checks the hardware of the Bus I/F function of the CC-Link IE Field Network board. The following shows a
procedure for performing a test.
Operating procedure
Memory test
Memory test checks the hardware of the memory function of the CC-Link IE Field Network board. The following shows a
procedure for performing a test.
Operating procedure
1.
Select a board to be tested on the "Board Diagnostics"
screen in CC IE Field Utility (
2.
Set Mode to "Bus I/F Test" and click the [Start Test]
button.
• Normal completion
• Abnormal completion
3.
The result is displayed on "Test Result" field.
If the test completes abnormally, please consult your local
Mitsubishi representative.
1.
Select a board to be tested on the "Board Diagnostics"
screen in CC IE Field Utility (
2.
Set Mode to "Memory Test" and click the [Start Test]
button.
Summary of Contents for MELSEC Q80BD-J71GF11-T2
Page 2: ......
Page 6: ...4 Disposal Precautions CAUTION When disposing of this product treat it as industrial waste ...
Page 118: ...116 12 MONITORING MEMO ...
Page 140: ...138 14 MELSEC DATA LINK LIBRARY MEMO ...
Page 142: ...140 15 PROGRAMMING 15 1 Precautions on Programming MEMO ...
Page 243: ...241 I U Utility 83 ...
Page 247: ......