230
14 PROCEDURES BEFORE OPERATION
14.1 Overview
14
PROCEDURES BEFORE OPERATION
14.1
Overview
This chapter describes the procedures before operation.
Procedure Item
Description
Reference
1
Preliminary inspection
Before supplying power, check that the power supply and ground
terminals are connected correctly and input/output devices are wired
properly.
Page 231 Preliminary Inspection
2
Installing a battery
Install a battery to the CPU module as needed.
(FX5U/FX5UC CPU modules only)
3
Inserting and removing the
SD memory card
Insert or remove the SD memory card to or from the CPU module as
needed.
Page 234 Inserting and Removing
4
Wiring of each device
Wire each device.
5
Powering on the system
Check the following items, and then power on the system.
• A cable is correctly connected to the power supply.
• Power supply voltage is within the specified range.
• The CPU module is in the STOP state.
When using an external power supply, turn on the power supply at the
same time as the CPU module or earlier than the CPU module. When
turning off the power, check the safety of the system and turn off the
power of the programmable controller (including extension devices) at
the same time.
6
Connecting a Personal
Computer
Connect a personal computer that has an engineering tool installed to
the CPU module.
Page 239 Connecting a Personal
7
Initializing the CPU Module
Initialize the CPU module using the engineering tool.
8
Setting parameters
Set system parameters, CPU parameters, and module parameters.
When the following function of the CPU module are used, parameters
of the function must be set.
• Built-in Ethernet function
• Function that uses an SD memory card
• When any intelligent function module is mounted
9
Programming
Create a program using the engineering tool.
10
Writing data to the
programmable controller
Write the parameters and the program created by using the
engineering tool to the programmable controller.
Page 249 Writing Data to the CPU
11
Resetting the CPU Module
Restart the system in either of the following ways.
• Power off and on the system.
• Resetting the CPU Module
12
Executing the program
Run the CPU module, and check that the P.RUN LED turns on.
Page 250 Executing the Program
13
Monitoring the Program
Check that the program operates normally using the engineering tool.
Summary of Contents for MELSEC iQ-F FX5UC Series
Page 2: ......
Page 142: ...140 8 CONNECTOR CONVERSION MODULE PERFORMANCE SPECIFICATIONS 8 2 External Dimensions MEMO ...
Page 144: ...142 9 SD MEMORY CARD PERFORMANCE SPECIFICATIONS 9 2 Formatting MEMO ...
Page 146: ...144 10 BATTERY PERFORMANCE SPECIFICATIONS 10 2 Battery Life MEMO ...
Page 277: ...I 275 MEMO ...
Page 281: ......