8 PROFIBUS Configuration Tool
8.2 "PROFIBUS Configurator Tasks" Window
67
8
5.
The following global labels and structures are created and displayed.
Precautions
• Do not change names of the created global labels and structures. If the names are changed, delete corresponding global
labels and structures then update PROFIBUS label again.
• The number (_1,_2...) is added automatically to the ending for names of the created global labels and some structures.
These numbers cannot change to any numbers since these numbers are used for identification in PROFIBUS
Configuration Tool.
Do not register global labels and structures with the following names since they are used when PROFIBUS labels are
updated.
If they are registered, PROFIBUS labels cannot be updated.
• Global labels with a name starting with "Global_FX5-DP-M..."
• Structures with a name starting with "FX5-DP-M..."
• Structures with a name starting with "stSLV..."
The structures can be created up to 800. If the structures exceed 800, update of PROFIBUS labels have
completed with an error.
In this case, delete the created structures (start with "FX5-DP-M...) manually. Uncheck the "Use label for
slaves" in the "CPU Device Access" window then update PROFIBUS labels again. (
Summary of Contents for FX5-DP-M
Page 1: ...MELSEC iQ F FX5 User s Manual PROFIBUS ...
Page 2: ......
Page 9: ...7 MEMO ...
Page 12: ...10 INDEX 168 REVISIONS 170 WARRANTY 171 TRADEMARKS 172 ...
Page 13: ...11 CONTENTS ...
Page 19: ...1 DESCRIPTION 17 1 MEMO ...
Page 100: ...98 9 PROGRAMMING 9 2 DP Master settings DP Slave FDL address 2 ...
Page 101: ...9 PROGRAMMING 9 2 DP Master settings 99 9 DP Slave FDL address 3 ...
Page 108: ...106 9 PROGRAMMING 9 8 Program Example of the Global Control Function ...
Page 109: ...9 PROGRAMMING 9 8 Program Example of the Global Control Function 107 9 ...
Page 110: ...108 9 PROGRAMMING 9 8 Program Example of the Global Control Function ...
Page 112: ...110 9 PROGRAMMING 9 9 Program Example of Acyclic Communication Acyclic Communication ...
Page 114: ...112 9 PROGRAMMING 9 10 Program Example of the Alarm Acquisition Function ...
Page 169: ...APPX Appendix 4 Processing Time 167 A MEMO ...
Page 175: ......