4 FUNCTIONS
4.2 PROFIBUS-DPV0
29
4
Execution of the global control function
Execute the global control function by the following procedure.
1.
Write services to send and target groups to 'Global control area' (Un\G2081).
(
2.
Turn on 'Global control request signal' (Un\G2.b4).
3.
When the global control processing is completed, 'Global control completed signal' (Un\G0.b4) turns on. If the processing
was completed with an error, 'Global control failed signal' (Un\G0.b5) turns on.
4.
Check that the global control processing has been completed and then turn off 'Global control request signal' (Un\G2.b4).
• To execute the global control function to all the DP-Slaves (including those without a group number), set all
of b8 to b15 of 'Global control area' (Un\G2081) to 0.
• For a program example of the global control function, refer to the following.
Summary of Contents for FX5-DP-M
Page 1: ...MELSEC iQ F FX5 User s Manual PROFIBUS ...
Page 2: ......
Page 9: ...7 MEMO ...
Page 12: ...10 INDEX 168 REVISIONS 170 WARRANTY 171 TRADEMARKS 172 ...
Page 13: ...11 CONTENTS ...
Page 19: ...1 DESCRIPTION 17 1 MEMO ...
Page 100: ...98 9 PROGRAMMING 9 2 DP Master settings DP Slave FDL address 2 ...
Page 101: ...9 PROGRAMMING 9 2 DP Master settings 99 9 DP Slave FDL address 3 ...
Page 108: ...106 9 PROGRAMMING 9 8 Program Example of the Global Control Function ...
Page 109: ...9 PROGRAMMING 9 8 Program Example of the Global Control Function 107 9 ...
Page 110: ...108 9 PROGRAMMING 9 8 Program Example of the Global Control Function ...
Page 112: ...110 9 PROGRAMMING 9 9 Program Example of Acyclic Communication Acyclic Communication ...
Page 114: ...112 9 PROGRAMMING 9 10 Program Example of the Alarm Acquisition Function ...
Page 169: ...APPX Appendix 4 Processing Time 167 A MEMO ...
Page 175: ......