
14. Maintenance
MiR250 Shelf Carrier User Guide (en) 03/2021 - v.1.4 ©Copyright 2021: Mobile Industrial Robots A/S.
222
14.2 Regular checks and replacements
Before starting replacement tasks that involve removal of the top or side covers:
•
Shut down the robot—see
Shutting down the robot on page 71
.
•
Disconnect the battery—see
Disconnecting the battery on page 74
contains the parts that you should check and how often you should do that.
Part
Maintenance
Interval
Safety PLC
In the robot interface under
Monitoring > Hardware health
> Communication
, see if the
robot is running with the correct
SICK configuration or if the
warning
The SICK Safety PLC is
running a non-standard
configuration
is shown.
Check monthly and after
commissioning or if you make
any changes to the robot setup.
Robot hardware
In the robot interface under
Monitoring > Hardware health
,
check if there are any warnings
(marked with yellow).
Check monthly and after
commissioning or if you make
any changes to the robot setup.
Front, rear, and
side
compartment
covers
Check mounting. Ensure the
covers are even and are not in
contact with the wheels.
Check monthly, and replace as
needed.
If you replace the cover
with the robot's nameplate,
make sure to mount a new
copy of the nameplate to the
replacement cover.
Loudspeaker
and signal lights
Check that all visual and auditory
warnings function.
Check monthly, and replace as
needed.
Swivel wheels
Check bearings and tighten, and
Check weekly, and replace as
Table 14.2.
Regular checks and replacements