![Minelab F3 COMPACT Metal Mine Service Manual Download Page 48](http://html1.mh-extra.com/html/minelab/f3-compact-metal-mine/f3-compact-metal-mine_service-manual_1801268048.webp)
F3 COMPACT Service Manual
_______________________________________________________________________________________________________________________
48
3.6.2
Fitting the Handle
a.
To fit the handle the detector body must be opened as described in Section
3.1 - Opening
the Detector Body
. Once completed:
•
Thread the wiring loom handle into the detector body.
•
Push the handle onto the pin handle pivot.
•
Connect the spring latch hinge to the latch hinge.
•
Feed the rod handle slide through the handle and into position.
•
Connect the wiring loom handle and fit into the cable router.
Figure 83: Threading the Wiring Loom
Pin Handle Pivot
Latch
Spring
Figure 84: Latch Hinge and Spring Latch Hinge
Rod passing through Armrest Slide
and Handle