![Minebea Intec Maxxis 5 Original Installation Manual Download Page 9](http://html1.mh-extra.com/html/minebea-intec/maxxis-5/maxxis-5_original-installation-manual_1801172009.webp)
2.4.1
Installation
The device has to be installed in an EMC-compliant manner, see Chapter
Setup
Version
Protection class
Installation
Control cabinet housing IP65, rear IP20
Control panel cut-out
Blackbox housing
IP20
Mounting rail installation (35 mm,
as per DIN 46277)
Table-top housing
IP65
Wall housing
IP65
Support bracket for wall mounting
To ensure proper cooling of the device, make sure air circulation around the device is not
blocked. Avoid exposing the instrument to excessive heat, e.g. from direct sunlight, and
vibrations. The ambient conditions in Chapter
must be taken into account at all
times.
With outdoor mounting, make sure that adequate weather protection is provided (for
temperatures, see Chapter
).
2.4.2
Opening the device
WARNING
Working on the device while it is switched on may have life-threatening
consequences.
When removing covers or parts using tools, live parts or terminals may be exposed.
Please note that capacitors in the device may still be charged even after disconnecting
the device from all voltage sources.
Disconnecting the device from the power supply.
This device contains electrostatically sensitive components. For this reason, an
equipotential bonding conductor must be connected when working on the open device
(antistatic protection).
2 Safety instructions
Process Controller Maxxis 5 PR 5900
Minebea Intec
EN-7
Summary of Contents for Maxxis 5
Page 137: ......