18 Installation
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
________________________________________________________________________________________________
MICROPLEX
Operator’s Manual SOLID 166E
Edition 1.1
2.3. Environment and Power Standards
Fig. 2.3.a SOLID 166E: Required space (plan view)
!
The printer’s first installation has to be done by a trained service
engineer.
Space required for maintenance service
Space required for usual printer operation
1000
1000
700
800
1 0 0 0
1 0 0 0
5 0 0
8 0 0
8 7 0
Front
Rear
Space required when
front cover is open
( Unit: mm )
SOLID 166E
1580
Stacker