Wall formwork
Mammut 350
Horizontal panels
Fig. 45.1
Description
Ref. No.
Foundation tape 50 m roll .....
29-307-50
Tensioner M ..........................
29-307-60
Trolley for foundation tape ....
29-307-55
Uni-tie claw ..........................
29-901-41
Drive nut 60 ..........................
29-900-23
A lot of forming problems can
easily be solved by arranging
panels horizontally. These include
basin walls in water treatment
plants, foundations and strip
footings which often require a
certain height.
When using foundation tapes
and tensioners M (Figures. 45.1
and 45.2), there is no need to
put tie rods through the lower
tie holes, which is very time-
consuming. The tensioner M for
foundation tape is clamped to
the panel.
When using panels horizontally,
tie rods can nevertheless be
installed in the bottom tie holes.
In this case the drive nut 60 must
be used (Figures 45.3 and 45.4).
Top ties: Instead of tying through
the tie holes and the concrete,
the Uni-tie claw can be used
for tying above the panel and
outside the concrete. Two Uni-tie
claws, one tie rod DW 15 and
two flange nuts 100 are required
per tie connection (Figures 45.1
to 45.4). We also recommend
the use of a plastic tube. It serves
as a spacer and protects the tie
connection against contamina-
tion.
Uni-tie claw
Flange nut 100
Tensioner M
Plastic tube
Foundation tape
Uni-tie claw
Flange nut 100
Plastic tube
Plastic tube
Drive nut 60
Fig. 45.2
Fig. 45.3
Fig. 45.4
Maximum tensioner spacing
Pouring height 75 cm
185 cm
Pouring height 100 cm
120 cm
Pouring height 135 cm
70 cm
Table 45.5
M350-45
Technical Instruction Manual / Status November 2018