MI 3311 GammaGT
Autotest sequences
47
Figure 6.20: Earth continuity result screen
Options in Earth continuity result screen:
NEXT
Proceeds to next step.
REPEAT
Repeat the test (use in case of multiple earthed points). Highest result will
be stored.
6.5.3 Insulation resistance measurement
The test is offered if it is applicable according to the autotest setting. The Insulation
starting screen is displayed first. Measurement and options in Insulation starting screen
are described in chapter
5.2.3 Insulation resistance
.
Figure 6.21: Insulation resistance starting screen
After the measurement is carried out the Insulation result screen is displayed.
Figure 6.22: Insulation result screen
There are no special options to be set in the Insulation resistance result screen.
6.5.4 Substitute leakage measurement
The test is offered if it is applicable according to the autotest setting. The Substitute
leakage current starting screen is displayed first. Measurement and options in Substitute
leakage starting screen are described in chapter 5.2.5 Substitute leakage.
Figure 6.23: Substitute leakage starting screen
After the measurement is carried out the Substitute leakage result screen is displayed.
Figure 6.24: Substitute leakage result screen
There are no special options to be set in the Substitute leakage result screen.