MI 3311 GammaGT
Main menu and test modes
24
Keys:
TEST
Starts test lead checking procedure.
ESC
Skips further tests.
Checking the IEC test cord
The connection for checking the IEC test cord is displayed. Before conducting the check,
connect the IEC test cord.
Figure 4.15: IEC test cord check starting screen
Keys:
TEST
Starts IEC test cord checking procedure.
ESC
Skips IEC test cord check.
After all steps were carried out the measured values together with an overall indication are
displayed in the CAL column.
Figure 4.16: Examples of Checkbox result screens
Meaning of indications:
Accuracy of result is inside the given accuracy limits.
*
Accuracy of result is close to the specified accuracy limits.
Warning:
The accuracy of the instrument could lie slightly out of specified limits!
Warning:
The accuracy of the instrument lies out of specified limits!
Keys:
/
Displays all calibration results.
TEST
Starts new calibration procedure.
ESC
Returns to
Setup menu.