Connecting SPG to Part02
To connect the SPG to Part02 a
“spacer-ring”
between Part01 and part02 is necessary. Otherwise
the motor would not fit into the chassis. The spacer is called
Part01 SPG spacer.
I recommend testing and adjusting the fit of all parts first, before all other work-steps.
For all following work-steps the crystal
chamber must be completely attached!
Now each
main threaded chassis rods
get a spacer.
I recommend to use threaded spacer
(rounded nuts). But this is not
absolutely necessary!
It is just easier to attach the
spinning
plasma gate
when the Part02 and the
crystal chamber is safe attached to the
main chassis.
These three spacer are also holding the
Part01 SPG spacer
(between
Part01
SPG
and
Part02
)
in position.
Spacer size:
2.8mm diameter / 2.75mm height
Part02 spacer
The easiest way to get the right spacer is to use
three washer and one M2 nut
for each threaded
rod.
Reduce the diameter of the washers and the nuts
to make them fit into the deepenings.
Attach a M2 threaded rod (3cm length) to a
rotating tool (Dremel).
Attach the washers and the nuts to the rod.
Turn on the rotating tool and hold the attached
rotating washers and nuts against a file or
sandpaper to
reduce the diameter to max 2.8mm
.
50