9.2 Monthly inspection:

The monthly inspection must be carried out by a 

responsible competent person, i.e. someone who 

has been instructed in the operation of the 

extraction system.
- Clogging in the filter are must be removed.

- Visual inspection for obvious defects or damage 

to the device or parts.

- The raw gas/filter chamber must be checked for 

unusual deposits and cleaned if necessary.

- Check  for  leaks.

- Leaky doors, flaps and housings must be sealed.

- Check the filter interior for chip deposits.

- Defective filters must be replaced.

9.3 Annual inspection:

The annual inspection must be carried out by a 

competent responsible person, i.e. someone who 

has been instructed in the maintenance of the 

system.
- Clogging in the filter are must be removed.

- Visual inspection for obvious defects or damage 

to the device or parts.

- The raw gas/filter chamber must be checked for 

unusual deposits and cleaned if necessary.

- Check all seals for damage and tight fit, replace if 

necessary.

- Defective filters must be replaced.

- Check the tightness of the housing and the 

container and seal if necessary.

- Check clean air chambers for dust deposits and 

clean if necessary.

- Check the cleaning device for damage and wear.

- Check the filter interior for chip deposits.

- Functional test of the filter differential monitoring.

- Extraction power control.

- Filter condition and tightness by visual inspection 

in the filter chamber and in the clean air chamber.

- Function of all warning devices, malfunction 

indicator lamps of the control, filter differential 

pressure control etc.

- Check the fan for dirt, vibration, damage, loose 

screws, and corrosion. Every 6 months check 

impeller and especially welds for possible 

formation of cracks.

- Clean the parts of the fan that come in contact 

with air to preserve their function

- Check the function of the pressure/flow 

regulators of the MSR devices

- Check on the outside for dirt, fixture, damage, 

and corrosion and clean if necessary.

- Re-righten the connection terminals

- Measure voltage, current consumption and 

phase symmetry; measurement data must be 

recorded in the measurement log

- Check bearing for noise

- Filter

- Check for inadmissible dirt and damage 

(leakage); filters must have the separation 

efficiency corresponding to the filter class over 

their entire service life. The filter must be 

replaced if there is noticeable dirt or leakage.

- Check differential pressure; if maximum 

differential pressure is exceeded, replace filter

- Cleaning;  check  wiper  arm  (17)

- Check device housing for dirt, damage, and 

corrosion Cleaning and repair

Caution!

Monthly and annual inspections must be 

documented in writing with the following content:
- Item  number

- Date of commissioning the chip extraction 

system

- Name of the person who commissioned the 

system.

- Date of inspection

- Name of tester

- Remark on the condition of the dust extractor 

and, if applicable, indication of defects

- Information on audit work

- Signature of operating personnel and 

responsible tester (see chapter 9.2 and 9.3)

The operating personnel shall properly enter all 

maintenance and revision work carried out in a list 

and have it confirmed in writing by a competent 

person. On request, this list must be submitted to 

the supervisory bodies, e.g. the trade association 

and trade supervisory office, duly completed and 

signed.

Caution!

If required, the chip extraction system should 

undergo an overhaul!

The maximum sound pressure level can be 

influenced by the installation of the system. The 

operator should subtract extraneous noise which 

is not causally connected to the chip extraction 

system in accordance with standard arithmetic. 

The airborne noise generated by the system can 

also be reflected by the adjacent workshop walls 

and ceilings. The reflections cause result in an 

increased level for smooth surfaces. In most 

cases, the operator can achieve an improvement 

by applying a targeted sound-absorbing cladding.
- A constant message “filter differential pressure 

high” can be caused by a clogged filter. The 

system must be switched off to remove this 

blockage. The operator should then manually 

clean the filter several times to remove the dust 

from the filter. If this is not successful, the filters 

must be cleaned by hand.

- If the newly inserted chip bag is pulled upwards 

during operation, the vacuum under the bag is 

not sufficient to hold it down. The reasons for this 

can be:

- the container is not in contact with the rubber 

sleeve
- a defective seal above the filling container
- a defective chip bag

Warning!

Diagnostics, troubleshooting and 

recommissioning may only be carried out by 

authorised persons. This applies in particular to 

work on electrical equipment within the control 

cabinet (e.g. test work, replacement, etc.)!

11.1 Decommissioning

Before starting any works, disconnect the system 

from the power supply (switch off all poles) and 

secure it against unauthorised reactivation.

Caution!

Certain plant components are pressurised.
If the system is decommissioned for a longer 

period of time, the instructions of the individual 

components must be observed.
In addition, the information of the component 

manufacturers must be observed (request if 

needed).
Before commissioning the system again, the 

points under chapter “commissioning and 

maintenance” must be observed.

f

Use only genuine Metabo accessories.
Use only accessories that fulfil the requirements 

and specifications listed in these operating 

instructions. 

Set of pocket filters with mounted filter plate

(as a replacement) ......... Order no. 0913059441

Chip bags (pack of 10)

....................................... Order no. 0913059433

Suction hose (as a replacement), flame-retardant,

Ø 100 mm, 2.5 m according to

Regulation ZH 1/139 .......Order no. 0913013565

Universal adapter  .......... Order no. 0913031288

Cleaning nozzle ............. Order no. 0913031270

Transfer ring  .................. Order no. 0913031300

Automatic switch-on 

ALV 10 ........................... Order no. 0913014634
See www.metabo.com or the catalogue for a 

complete range of accessories.

Danger! Repairs to this device must be 

carried out by qualified electricians only! 

Rectification of incorrect direction of rotation of the 

drive elements:

- A phase inverter is installed in the insulating 

section of the plug, which is turned by 180° using 

a slotted screwdriver.

Please contact your Metabo service centre if you 

have Metabo devices that require repairs. For 

addresses see www.metabo.com.
You can download a list of spare parts from 

www.metabo.com.

Observe national regulations on environmentally 

compatible disposal and on the recycling of 

disused machines, packaging and accessories.

Only for EU countries: never dispose of 

power tools in your household waste! 

According to European Directive 2012/19/

EU on Waste from Electric and Electronic 

Equipment and implementation in national law, 

used power tools must be collected separately and 

recycled in an environmentally-friendly manner.

Changes due to technological progress reserved.

SPA 2002 W

Suction nozzle: ......................................100 mm 

Rated

output of motor: ...... 1.1 kW, 1 Ph, 230 V / 50 Hz

Nominal volume flow at the nozzle:  .....565 m3/h

Negative pressure at the nozzle 

with nominal volume flow:  .....................2118 Pa 

Electrical connection: ...... connection cable: 5 m

........................................... H07RNF 3x1.5 mm2

.................................Plug: Schuko plug CEE 7/4

Power consumption: ................................. 6.8 A 

Filtering surface:  .....................................4.1 m2 

Filling container volume: .................... max. 135 l 

Dimensions l x b x h:  ..... 1178 x 650 x 1973 Unit 

weight: .................................................... 114 kg 

Residual dust content:  ........... H3 (< 0.1 mg/m3) 

Filter pressure

monitoring: .......Differential pressure gauge with 

pointer Filter cleaning:... manual cleaning Sound 

pressure level according to BG: ............69 dB(A)

Noise value according to MRL appendix 1, point 

1.7.5 f in free field, distance 1 m, height 1.6 m. 

measurement uncertainty 4 dB. Measurement 

according to DIN EN ISO 11201.

**

SPA 2002 D

Suction nozzle: ......................................100 mm 

Rated motor output:  1.5 kW, 3 Ph, 400 V / 50 Hz 

Nominal volume flow at the nozzle:  .....565 m3/h 

Negative pressure at the nozzle 

with nominal volume flow:  .....................2124 Pa 

Electrical connection: ...... connection cable: 5 m

........................................... H07RNF 4x1.5 mm2

.................... Plug: CEE 16 A - 6 h phase inverter

Power consumption: ................................. 3.4 A 

Filtering surface:  .....................................4.1 m2 

Filling container volume:  ................... max. 135 l 

Dimensions l x b x h:  ..... 1178 x 650 x 1973 Unit 

weight: .................................................... 116 kg 

Residual dust content:  ........... H3 (< 0.1 mg/m3) 

Filter pressure

monitoring: .......Differential pressure gauge with 

pointer Filter cleaning: .. manual cleaning Sound 

pressure level according to BG:  ...........69 dB(A)

Noise value according to MRL appendix 1, point 

1.7.5 f in free field, distance 1 m, height 1.6 m. 

measurement uncertainty 4 dB. Measurement 

according to DIN EN ISO 11201.

**

**

The values stated are emission values and as 

such do not necessarily constitute values which 

are safe for the workplace. Although there is a 

correlation between emission levels and 

environmental impact levels, whether further 

precautions are necessary cannot be derived from 

this. Factors influencing the actually present 

environmental impact level in the workplace 

include the characteristics of the work area and 

other noise sources, i.e. the number of machines 

and other neighbouring work processes. The 

permissible workplace value may vary from 

country to country. This information is intended to 

assist the user in his estimate of hazards and risks. 

10. Help in case of malfunctions

11. Shutdown

12. Accessories

13. Repairs

14. Environmental Protection

15. Technical Specifications

Summary of Contents for SPA 2002

Page 1: ...nl Oorspronkelijke gebruiksaanwijzing 18 it Istruzioni originali 23 es Manual original 28 pt Manual original 33 sv Bruksanvisning i original 38 fi Alkuper iset ohjeet 42 no Original bruksanvisning 47...

Page 2: ...00100 SPA 2002 D 0130200110 2 2014 30 EU 2006 42 EG 2011 65 EU 3 EN ISO 12100 2010 EN 60204 1 2006 A1 2009 EN 349 1993 A1 2008 EN ISO 13857 2008 EN 16770 2018 GS HO 07 2015 VDI 3677 2010 EN 50581 2012...

Page 3: ...nsachgem en Einsatz und Betrieb der Anlage zu vermeiden Warnung Montage elektrischer Anschluss Versorgungsanschluss Wartung Inbetriebnahme Instandsetzung usw d rfen nur von ausgebildetem Fachpersonal...

Page 4: ...tflammbar sein Nur Schl uche mit entsprechenden Nennweiten verwenden Detaillierte Anforderungen f r Rohrleitungssysteme nur Rohre aus Stahl und schwerentflammbare flexible Schl uche mit Metallwendel z...

Page 5: ...Hauptschalter ausschalten Bei dieser T tigkeit ist in jedem Fall mit einer Staubmaske Filtermaske mit Partikelfilter Filterklasse 2 zu arbeiten Es ist zu vermeiden dass unbeteiligte Personen mit Staub...

Page 6: ...erzustand und Dichtigkeit durch Sichtkontrolle in der Filterkammer und in der Reinluftkammer Funktion aller Warneinrichtungen St rungs Anzeigelampen der Steuerung Filterdifferenzdruck Kontrolle usw Ve...

Page 7: ...abreinigung Schalldruckpegel nach BG 69 dB A L rmwert gem MRL Anhang 1 Punkt 1 7 5 f im Freifeld Abstand 1 m H he 1 6 m Messunsicherheit 4 dB Messung nach DIN EN ISO 11201 SPA 2002 D Ansaugstutzen 100...

Page 8: ...plug is disconnected and secured against unauthorised reconnection The system must be properly installed and used in accordance with our instructions If assembly is carried out contrary to our regulat...

Page 9: ...specified by Metabo Any use other than or going beyond that described under point 2 Intended use is not considered as intended The manufacturer is not liable for any resulting damage Possible misuse i...

Page 10: ...Over the course of time the filter elements will slowly become clogged with fine dust embedded deep in the pores This fine dust can no longer be removed by the filter cleaning system In this case the...

Page 11: ...ve chip bag Warning Diagnostics troubleshooting and recommissioning may only be carried out by authorised persons This applies in particular to work on electrical equipment within the control cabinet...

Page 12: ...and without material transport The impact of the transported dust and chips on the walls of the pipeline system can lead to a level increase of up to 10 dB and in some cases even more compared to the...

Page 13: ...die et autres li s une utilisation et un fonctionnement non conformes du dispositif Avertissement Le montage le branchement lectrique le branchement de l alimentation la maintenance les r parations et...

Page 14: ...at riau du flexible dans la zone d nud e et replier le fil m tallique nu vers l int rieur de mani re ce que la conductibilit lectrique vers la tubulure d aspiration soit assur e lors du raccordement d...

Page 15: ...t d pli Glisser ensuite le sac dans le r servoir 1 et le retourner si possible sans plis sur le bord sur env 100 mm fig E Veiller ce qu il adh re particuli rement bien la fen tre transparente 2 afin d...

Page 16: ...cas ch ant les tanch ifier V rifier s il y a des d p ts de poussi re dans les compartiments air et le cas ch ant les nettoyer V rifier si le syst me de nettoyage n est pas endommag ou us Contr ler s...

Page 17: ...areil 114kg Teneur r siduelle en poussi re H3 0 1 mg m Surveillance de la pression des filtres manom tre de pression diff rentielle aiguille Nettoyage des filtres nettoyage manuel Niveau de pression a...

Page 18: ...gevaren door het ondeskundige gebruik en werking van de installatie te voorkomen Waarschuwing Montage elektrische aansluiting voedingsaansluiting onderhoud ingebruikname reparatie enz mogen uitsluiten...

Page 19: ...talen spiraal ca 5 cm gestript worden Het resterende slangmateriaal in het gestripte gebied verwijderen en de blanke metaaldraad zo naar binnen buigen dat bij het opsteken van de slang een correcte el...

Page 20: ...moet op gelet worden dat hij vooral glad tegen het kijkvenster 2 ligt om de vulpeilhoogte te kunnen aflezen Na het inschuiven van het reservoir wordt het vulreservoir door het gelijktijdig bedienen va...

Page 21: ...huizing en van het reservoir controleren en evt afdichten Schone lucht kamers op stofafzettingen controleren en evt reinigen De reinigingsinrichting op beschadigingen en op slijtage controleren Binnen...

Page 22: ...tekker CEE 7 4 Stroomopname 6 8A Filteroppervlak 4 1m2 Vulreservoirvolume max 135 l Afmetingen l x b x h 1178 x 650 x 1973 Apparaatgewicht 114kg Reststofgehalte H3 0 1 mg m3 Filterdruk controle wijzer...

Page 23: ...i collegamenti elettrici gli allacciamenti di servizio la manutenzione la messa in servizio le riparazioni ecc possono essere eseguite solo da personale qualificato e addestrato Il sistema di aspirazi...

Page 24: ...in modo che venga stabilita una conduttivit elettrica adeguata alla porta di aspirazione quando il tubo collegato Quindi fissare il tubo con una fascetta filettata o una cinghia di tensionamento I tub...

Page 25: ...ssicurasi che il sacchetto si adatti perfettamente alla finestrella 2 per poter leggere il livello di riempimento Dopo l avanzamento del contenitore il contenitore di riempimento viene inserito saldam...

Page 26: ...lita relativamente ai depositi di polvere e pulire se necessario Controllare il dispositivo di pulizia per danni e usura Controllare l interno del filtro per il deposito di trucioli Test funzionale de...

Page 27: ...l Dimensioni l x b x h 1178 x 650 x 1973 Peso unitario 114kg Contenuto di polvere residua H3 0 1 mg m3 Monitoraggio pressione filtro manometrodifferenziale puntatore Pulizia filtro pulizia manuale de...

Page 28: ...to Observe los siguientes puntos para evitar lesiones incendios y otros riesgos debido al uso y manejo indebidos del equipo Advertencia Solo el personal especializado podr llevar a cabo las tareas de...

Page 29: ...nguera con una brida o banda de sujeci n Las mangueras de pl stico deber n ser de dif cil inflamabilidad Utilice nicamente mangueras con el ancho nominal correspondiente Requerimientos detallados para...

Page 30: ...encuentra en el recipiente de llenado 1 en el suministro de entrega se incluye un saco de virutas A continuaci n introduzca la bolsa para virutas en el dep sito de llenado 1 y d blela en lo posible si...

Page 31: ...probar si el dispositivo para la limpieza del filtro presenta da os as como su desgaste Verificar si hay sedimentos de virutas en el compartimiento interior del filtro Prueba de funcionamiento del con...

Page 32: ...H07RNF 3x1 5 mm2 Enchufe Schuko CEE 7 4 Consumo de corriente 6 8 A Superficie del filtro 4 1 m2 Volumen del recipiente de llenado m x 135 l Dimensiones L x AN x ALT 1178 x 650 x 1973 Peso del equipo 1...

Page 33: ...companhado destes documentos Observe estes pontos para evitar o risco de ferimentos inc ndio e outros perigos provocados por uma utiliza o e opera o incorretas do sistema Aviso A montagem liga o el tr...

Page 34: ...o arame met lico descarnado para dentro de forma a criar uma condutibilidade el trica perfeita em rela o ao bocal de aspira o ao encaixar a mangueira Em seguida fixe a mangueira com uma bra adeira de...

Page 35: ...e poss vel sem pregas aprox 100 mm por cima do rebordo fig E Certifique se de que o mesmo assenta de forma plana especialmente na janela de inspe o 2 de forma a conseguir ler o n vel de enchimento Dep...

Page 36: ...ltros danificados Verificar a estanquidade da caixa e do recipiente e se necess rio vedar Verificar se as c maras de ar limpo apresentam acumula es de p e se necess rio limpar Verificar se o sistema d...

Page 37: ...recolha m x 135 l Dimens es c x l x a 1178 x 650 x 1973 Peso do aparelho 114kg Teor de poeira residual H3 0 1 mg m3 Monitoriza o da press o do filtro man metro de press o diferencial de ponteiros Limp...

Page 38: ...ingar Om montering sker p ett felaktigt s tt och det uppst r defekter skador till f ljd av obeh rig ndring bearbetning eller annan behandling har kunden ingen r tt till skadeers ttning eller garanti K...

Page 39: ...uppst r till f ljd av felaktig anv ndning Exempel p m jlig felanv ndning Transport av medier med otill tet h ga eller l ga temperaturer aggressiva eller mycket dammhaltiga medier Se punkt 4 sida 3 f r...

Page 40: ...aren underifr n N r muttrarna har tagits bort med en skruvmejsel nyckelvidd 10 kan torkararmarna 17 tas ut separat N r torkararmarna 17 och jordkabeln demonterats fr n vibrationsstaven 16 kan staven d...

Page 41: ...beaktas Beakta ven informationen fr n komponenternas tillverkare fr ga efter den vid behov Innan maskinen tas i drift igen ska punkterna under kapitel Drifts ttning och underh ll beaktas f Anv nd bar...

Page 42: ...to on irrotettu ja ett laitteisto onvarmistettu tahatonta p llekytkemist vastaan Laitteisto on asennettava asianmukaisesti ja noudattaen tarkkaan ohjeitamme Jos asennus suoritetaan m r ystemme vastais...

Page 43: ...amiseksi puhaltimeen suodattimeen asti 4 4 Mahdollinen v rink ytt Sahanpuruimuria saa ainoastaan k ytt Metabon m r mien teknisten tietojen sis ll Toisenlainen tai sen ylitt v k ytt kuin kohdassa 2 M r...

Page 44: ...en alue laite on sammutettava ja suodatin 14 on puhdistettava liikuttamalla puhdistusvipua 6 yl s ja alas useamman kerran Huomio Puhdistus 6 toimii vain puhaltimen ollessa pys htynyt l aja puhdistusvi...

Page 45: ...ttaa parempia tuloksia asentamalla kohdistetusti ni vaimentavia verhouksia Jatkuva ilmoitus suodattimen paine ero korkea voi johtua suodattimen tukkeutumisesta T m n tukkeutumisen poistamiseksi laitte...

Page 46: ...muut nil hteet ts koneiden ja muiden l heisten ty pisteiden lukum r Sallitut ty paikan raja arvot voivat lis ksi vaihdella maittain T m n tiedon avulla k ytt j n tulisi kuitenkin kyet arvioimaan pare...

Page 47: ...iding eller annen behandling er alle krav p skadeserstatning eller garanti utelukket Kj per m selv bevise at ukyndig montering ikke for rsaket skaden De generelle vedlikeholdsanvisningene i drifts og...

Page 48: ...sonale og eller brukes p feil m te eller til ikke forskriftsmessige form l Restfarer er potensielle ikke penbare farer som f eks Skade som f lge av at sikkerhetsanvisninger standarder retningslinjer e...

Page 49: ...stangen 16 peker i riktig retning Tre inn bankestangen 16 og sikre den i enden med en festeskrue Sett inn viskerarmene 17 pass p at utsparingen for akselen kommer riktig og fest med sikringsmuttere Ik...

Page 50: ...eserve Best nr 0913059441 Sponsekker pakke 10 stk Best nr 0913059433 Sugeslange reserve brannhemmende 100 mm 2 5 m tilsv forskrift ZH 1 139 Best nr 0913013565 Universaladapter Best nr 0913031288 Rense...

Page 51: ...od utilsigtet gentilkobling Anl gget skal monteres korrekt og anvendes under n je overholdelse af vores anvisning Udf res monteringen i strid med vores bestemmelser og er den opst ede mangel skade i f...

Page 52: ...f metal og fleksslanger skal for afledning af statisk elektricitet fra bearbejdningsmaskinen til ventilatoren filteret v re komplet elektrisk jordforbundne 4 4 Mulig forkert anvendelse Sp nudsugningsa...

Page 53: ...n medf re brud p l behjulene hvilket kan f re til alvorlige skader p udstyret og personskader 8 5 Filter 14 8 5 1 Filterrensning Filtermodstanden overv ges af et manometer 9 p udstyret N r det maks ti...

Page 54: ...yd kan blive reflekteret af v rkstedsv gge og lofter i n rheden Reflektionerne bevirker ved glatte overflader en for gelse af niveauet I de fleste tilf lde kan brugeren opn en forbedring ved at monter...

Page 55: ...eau p arbejdspladsen kan v re arbejdsrummets udformning og andre st jkilder f eks antallet af maskiner og andre ved siden af liggende arbejdsforl b Den tilladte gr nsev rdi for arbejdspladser kan ogs...

Page 56: ...ga aby unikn obra e po aru i innych niebezpiecze stw wskutek nieprawid owego stosowania i eksploatacji urz dzenia Ostrze enie Monta pod czenie do instalacji elektrycznej pod czenie do zasilania konser...

Page 57: ...stosowa tylko rury ze stali i trudno zapalne w e ze spiral metalow zapewni przewodz ce uziemienie Zastosowanie zasuwy automatycznej je eli jest Unika pr dko ci powietrza poni ej minimalnej pr dko ci t...

Page 58: ...ask z filtrem cz stek sta ych klasy 2 Unika obci ania py em os b nieuczestnicz cych w pracach Nowy worek filtracyjny na py zak ada zgodnie z powy szym opisem zak adanie worka na wi ry rys E 8 4 Wentyl...

Page 59: ...cz ci wentylatora stykaj cych si z powietrzem Sprawdzi dzia anie regulator w ci nienia nat enia przep ywu nale cych do AKPiA Sprawdzi z zewn trz pod k tem czysto ci mocowa uszkodze i korozji w razie...

Page 60: ...i 1 6 m niepewno pomiaru 4 dB Pomiar wg DIN EN ISO 11201 SPA 2002 D Kr ciec ssawny 100mm Moc znamionowa silnika 1 5 kW 3 fazy 400 V 50 Hz znamionowe nat enie przep ywu w kr cu 565 m3 h podci nienie w...

Page 61: ...r m s St 2 St 3 10 mJ BGI 739 1 GS HO 07 Pr f und Zertifizierungsstelle Holz im Fachbereich Holz und Metall Vollmoellerstra e 11 70563 Stuttgart 3 H3 0 1 mg m3 GS 30 100 mm 0 00785 m2 A1 1 A2 2 A3 A1...

Page 62: ...el 62 1 SprenG St 2 St 3 VDE 0165 6 6 1 4 1 Metabo 8 5 4 St 1 2 mg m3 4 2 4 3 4 3 1 4 3 2 100 mm 5 cm 4 3 3 B 1 4 3 4 0 5 m 4 3 5 4 4 Metabo 2 4 3 4 5 4 6 3 G...

Page 63: ...el 63 12 F 4 7 20 m s VDE 0100 0113 0165 18 m s 20 m s 2 A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 8 1 8 2 SPA 2002 D 1 3 FI RCD 30 mA 8 3 1 1 100 mm E 2 3 2 E 8 4 1 2 3 4 5 6 7 8 9 5 6 7 8...

Page 64: ...el 64 8 5 14 8 5 1 9 6 14 6 8 5 2 8 5 3 14 1 10 17 17 16 16 7 8 13 B C 16 16 17 8 13 7 24 8 5 4 3 1 2 8 3 8 6 1 5 cm 2 3 4 8 7 8 7 1 100 230 EN 61000 3 11 0 275 j0 172 100 400 9 1 9 2 9 3 6 MSR 9...

Page 65: ...W 100mm 1 1 kW 1 Ph 230 V 50 Hz 565 m3 h 2118Pa 5 m H07RNF 3x1 5 mm2 CEE 7 4 6 8A 4 1m2 135 l x x 1178 x 650 x 1973 114kg H3 0 1 mg m3 BG 69 dB A MRL 1 1 7 5 f 1 m 1 6 m 4 dB DIN EN ISO 11201 SPA 200...

Page 66: ...zemel s okozta s r l si t z s egy b vesz lyek elker l se rdek ben Vigy zat Az sszeszerel st a villamos csatlakoztat st az ell t csatlakoz st a karbantart st a haszn latba v telt a helyre ll t st stb c...

Page 67: ...s f ldel shez biztos tani kell a folyamatos f ldel st automatikus tolatty haszn lata amennyiben sz ks ges a minim lis sz ll t l gsebess g alatti l gsebess g elker l se 4 3 3 Ventil tor A ventil tor fe...

Page 68: ...lel en kell behelyezni E jel bra 8 4 Ventil tor zembe helyez s el tt 1 Ellen rizze a friss leveg ter letet idegentestre tekintettel 2 Ellen rizze a g rg szabad mozg s t annak k zzel val elforgat s val...

Page 69: ...jelz l mp it a sz r nyom sk l nbs g nek ellen rz s t stb ellen rizni kell Ellen rizze a ventil tort szennyez d sekre rezg sekre rong l d sra laza csavarokra valamint rozsd sod sra tekintettel 6 havon...

Page 70: ...a BG szerint 69 dB A A zaj rt k a MRL 1 sz mell klet 1 7 5 f pontnak megfelel en szabad fel leten 1 m es t vols gb l 1 6 m es magass gban M r si bizonytalans g 4 dB M r s a DIN EN ISO 11201 szerint SP...

Page 71: ...200 St 2 St 3 10 BGI 739 1 BGI Berufsgenossenschaftliche Informationen GS HO 07 Pr f und Zertifizierungsstelle Holz Vollmoellerstra e 11 70563 Stuttgart 3 H3 0 1 3 GS 30 100 0 00785 2 A1 1 A2 2 A3 A1...

Page 72: ...ru 72 CEE 3 x 16 1 x 10 1 SprenG St 2 St 3 VDE 0165 6 6 1 4 1 TN Metabo 8 5 4 St 1 2 3 4 2 4 3 4 3 1 4 3 2 100 5 4 3 3 B 1 4 3 4 0 5 4 3 5 4 4 Metabo 2 4 3 4 5...

Page 73: ...ru 73 4 6 3 G 12 F 4 7 20 VDE 0100 0113 0165 18 20 2 A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 8 1 8 2 SPA 2002 D 1 3 30 8 3 1 1 100 E 2 3 2 5 6 7 8...

Page 74: ...8 4 1 2 3 4 5 6 7 8 9 8 5 14 8 5 1 9 6 14 6 8 5 2 8 5 3 14 1 SW 10 17 17 16 16 7 8 13 B C B 16 16 17 8 13 7 24 8 5 4 3 1 2 8 3 8 6 1 5 2 3 4 8 7 8 7 1 100 230 EN 61000 3 11 0 275 j0 172 100 400 9 1 9...

Page 75: ...com 180 Metabo Metabo www metabo com www metabo com 2012 19 SPA 2002 W 100 1 1 1 230 50 565 3 2118 5 H07RNF 3x1 5 2 CEE 7 4 6 8 4 1 2 135 x x 1178 x 650 x 1973 114 H3 0 1 3 BG 69 A 1 1 7 5 f 1 1 6 4...

Page 76: ...ru 76 BG 69 A 1 1 7 5 f 1 1 6 4 DIN EN ISO 11201 10...

Page 77: ......

Page 78: ......

Page 79: ......

Page 80: ...Metabowerke GmbH Metabo Allee 1 72622 Nuertingen Germany www metabo com 1151691176 1219...

Reviews: