Operating instructions wet waste treatment unit, Model AZP 80, AZ / AP 80
Service step
Maintenance
Cleaning works
Daily
At least once
quarterly
At least once
or twice a
year
but
every
1000 h
At least once
yearly
but
every
2000 h
PLEASE NOTE:
Whenever any electrical components are disconnected and reconnected, replaced
or repaired, a safety test must be conducted, at least on these components!!!
Datei:BA_AZP80_AZ_AP_9633432_EN_2005-10.docx
9633432
33/36
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
8. Waste water equipment
Check drain cock and standpipe for watertightness
9. Electrical equipment
Tighten all screwed fuses and connections
Check all switches for correct operation and damage (see electrical wiring
diagram)
Carry out a visual check on all electrical equipment (e.g. switches, cables,
housings, covers).
Make the operator aware of the need for electrical safety checks. (One at
least every 4 years according to BGVA 3)
Check s
afety switch
for correct disconnection
Check electrical function of the limit switch
Check limit switch for mechanical damage
10. Desinfectant dosage
Check function (if possible, coordinate with chemical supplier)
11. Function test on the complete machine
Check machines for the interaction of all functions
Test run: Check results
The service steps
-
must be carried out by personnel trained for this purpose.
trained operating personnel
company tradesman after instruction
trained company tradesmen or installation engineers
installation engineers trained by MEIKO
You can document the completed maintenance work on the following pages. MEIKO recommends that you enter
the half-yearly service steps (
), and the annual service steps (
).