Operating instructions wet waste treatment unit, Model AZP 80, AZ / AP 80
Datei:BA_AZP80_AZ_AP_9633432_EN_2005-10.docx
9633432
21/36
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
10
Operation with the food waste treatment machine
10.1.1 Basic safety measures during normal operation
The installation may only be operated by trained and authorized persons who are familiar
with the operating instructions and who are capable of working in accordance with them!
Before switching the installation on, check and ensure that
•
Only authorized persons are present in the installation’s operating area
•
Nobody will be injured when the installation starts
Before commissioning, each time
•
Inspect the installation for any visible damage and ensure that it will only be operated in
a perfect condition!
Report any defects to the foreman immediately!
•
Remove any materials or objects not required for the operation of the installation from
the installation’s operating area!
•
Check and ensure that all the safety equipment is operating perfectly!
ATTENTION!