Operating instructions wet waste treatment unit, Model AZP 80, AZ / AP 80
Service step
Maintenance
Cleaning works
Daily
At least once
quarterly
At least once
or twice a
year
but
every
1000 h
At least once
yearly
but
every
2000 h
PLEASE NOTE:
Whenever any electrical components are disconnected and reconnected, replaced
or repaired, a safety test must be conducted, at least on these components!!!
Datei:BA_AZP80_AZ_AP_9633432_EN_2005-10.docx
9633432
31/36
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
1. General cleaning
Screen basket
Tank cover screen
Solids eliminator
Screen cylinder
Shredding tank
Tank filling sensor
2. Drives
Check drive motor
Check drive motor for exterior damage
Check drive motor for quiet running
Check current consumption
(
I
N
see wiring diagram)
Check ventilation grid for cleanliness
3. Flushing pump
Check pump motor
Check motor for exterior damage
Check current consumption
(
I
N
see wiring diagram)
Check motor for quiet running (bearing damage)
Check ventilation grid for cleanliness
Check flushing pump
Check sliding ring seal for watertightness (external visual check)
Replace sliding ring seal
Approx. every 2 years
approx. every 3000 h
Check pump impeller for damage
Check pump housing for damage